Report No.

1769
Halliburton Verification

Type of audit

External Audits
Halliburton

Auditee/Customer

Halliburton
PGNIG Upstream Norway

Date

2019/06/20

2363 days ago

Findings

18
Number of findings

Status

Closed
External Audits


Halliburton Verification
Summary

Following this year’s planned Shrek exploration well for PGNiG, a verification of Halliburton mud, cement, mudlogging, MWD/LWD/DD, bit, coring and BSS services was performed to ensure a high level of quality and commitment to deliver a first-class performance for the Shrek well.

Findings

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Halliburton – CVs for coordinators to be sent to PGNiG/WE

    Closed
    Responsible for follow up: Anne Mork (Well Expertise). CVs recieved. Action

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Halliburton Cement – software issue with electrical batch mixer

    Responsible for follow up: Stig Seland (Well Expertise). 29.08.19: No issues anymore. Report from Halliburton

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Odfjell – Missing remote operated valves on 2 cement silos

    Responsible for follow up: Stig Seland (Well Expertise). 29.08.19: Missing 2 auto purge on CMT tank 1 and 2. Missing 6 bulk valves in total in cross (4barytt and 2 to cement). Pipelines are delivered but not installed, valves are not received. Larger job, NOV needs to include it in cyberbase.
    CMT jobs are done from 3 and 4. Bulk operations are covered in procedures.

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Halliburton Cement – 1 of the 6 planned cement operators does not have the qualifications of running downhole tools.

    Responsible for follow up: Øystein Prytz (Well Expertise). Minimum 1 personnel onboard will have the qualifications to run downhole tools. Action closed.

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Halliburton Mud – Current work bench to be upgraded to steel bench, fire proof chemical cabinet needed

    Responsible for follow up: Stig Seland (Well Expertise).29.08.19: Steel bench and fireproof cabinet installed.

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Halliburton Mud/Odfjell/Aker BP – Internet and phone issue

    Responsible for follow up: Stig Seland (Well Expertise) Had some troubles earlier with connection. Been a lot better lately, phones – internet on rig and connection to shore. Action closed.

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Odfjell/Halliburton Mud – Volume sensors in some tanks and pits are out of calibration

    Responsible for follow up: Stig Seland (Well Expertise). 29.08.19: all pit sensors are working as expected. Action closed.

  • Actions

    Closed


    Closed


    Deadline was:

    Odfjell/Halliburton mud – Only one hose in loading station common for OBM and WBM transfers from boat

    No plans of using deicated hose for WBM or OBM.

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Odfjell/Halliburton mud – Shelves for screen storage is being planned, screens are currently being stored on pallets on the floor

    Responsible for follow up: Stig Seland (Well Expertise). 29.08.19: screens shelves installed in shaker room. Action closed.

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Halliburton mud/PGNiG – Halliburton does not have the inhouse expertise to qualify the mud for finger printing. PGNiG to explain how this will be done, what characteristics are acceptable etc.

    Responsible for follow up: Stig Seland (Well Expertise). N/A, decided to use new mud for 12 1/4″ and 8 1/2″ sections.

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Halliburton mud – 20/80 W/O ratio: Slightly compromised sag stability might be indicating in testing. Check if acceptable with Halliburton mud.

    Responsible for follow up: Øystein Prytz (Well Expertise). 07.08.19: Mail correspondance with Duncan Clinch in Halliburton Baroid; Sagging is unlikely, only 17 degrees inclination planned. Action closed.

  • Actions

    Closed


    Closed


    Follow up action only.

    Halliburton mudlogging/Odfjell/Aker BP – Currently no phones in the DCR

    Responsible for follow up: Stig Seland (Well Expertise). 29.08.19: Phones installed. Action closed

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Halliburton mudlogging/Odfjell – Experienced some unexpected loss of power in the technical room during maintenance

    Responsible for follow up: Stig Seland (Well Expertise). 29.08.19: Planned maintenance work on VDF. Due to poor information, it wasn’t informed that the power went off in that area. Action closed.

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Halliburton mudlogging/Odfjell – Rig signal for Flow Out and Density Out is missing

    Responsible for follow up: Stig Seland (Well Expertise). 29.08.19: flow out available. Density from rig unavailable. Halliburton uses own MW sensors. Action closed.

  • Actions

    Closed


    Closed


    Deadline was:

    Halliburton DD/MWD/LWD/Odfjell – BHAs are made on the main rotary; aux has not enough height

    Responsible for follow up: Øystein Prytz (Well Expertise). 15.07.19: No aux on DSN, but BHA can be made up offline with torque master. The plan is to optimise this offline building capacity. Action closed.

  • Actions

    Closed


    Closed


    Halliburton to send substitution plan 2019 to PGNiG/WE

    Responsible for follow up: Christina Rødne (Well Expertise). Halliburton Substitution Plan 2019 received 25.06.2019. Closed out

  • Actions

    Closed


    Closed


    Update of Halliburton Measurement Program

    Responsible for follow up: Christina Rødne (Well Expertise). Sent M6 Guidance to Halliburton 15.07.2019. Action closed.

  • Actions

    Closed


    Closed


    Deadline was:

    There is no database to support transfer of lessons learned from project to project.

    Halliburton should evaluate to set up a data base which makes it possible to transfer lessons learned from project to project.

    N/A



Additional Documentation

PGNiG-Halliburton-Verification-20.06.19-SIGNED.pdf


PGNiG-Halliburton-Verification-20.06.19-SIGNED.pdf




New Audit Report

You do not have permission to view this form.


\n


Halliburton

No person selected

Report No.

1769
Halliburton Verification

Type of audit

External Audits
Halliburton

Auditee/Customer

Halliburton
PGNIG Upstream Norway

Date

2019/06/20

2363 days ago

Findings

18
Number of findings

Status

Closed
External Audits


Halliburton Verification
Summary

Following this year’s planned Shrek exploration well for PGNiG, a verification of Halliburton mud, cement, mudlogging, MWD/LWD/DD, bit, coring and BSS services was performed to ensure a high level of quality and commitment to deliver a first-class performance for the Shrek well.

Findings

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Halliburton – CVs for coordinators to be sent to PGNiG/WE

    Closed
    Responsible for follow up: Anne Mork (Well Expertise). CVs recieved. Action

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Halliburton Cement – software issue with electrical batch mixer

    Responsible for follow up: Stig Seland (Well Expertise). 29.08.19: No issues anymore. Report from Halliburton

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Odfjell – Missing remote operated valves on 2 cement silos

    Responsible for follow up: Stig Seland (Well Expertise). 29.08.19: Missing 2 auto purge on CMT tank 1 and 2. Missing 6 bulk valves in total in cross (4barytt and 2 to cement). Pipelines are delivered but not installed, valves are not received. Larger job, NOV needs to include it in cyberbase.
    CMT jobs are done from 3 and 4. Bulk operations are covered in procedures.

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Halliburton Cement – 1 of the 6 planned cement operators does not have the qualifications of running downhole tools.

    Responsible for follow up: Øystein Prytz (Well Expertise). Minimum 1 personnel onboard will have the qualifications to run downhole tools. Action closed.

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Halliburton Mud – Current work bench to be upgraded to steel bench, fire proof chemical cabinet needed

    Responsible for follow up: Stig Seland (Well Expertise).29.08.19: Steel bench and fireproof cabinet installed.

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Halliburton Mud/Odfjell/Aker BP – Internet and phone issue

    Responsible for follow up: Stig Seland (Well Expertise) Had some troubles earlier with connection. Been a lot better lately, phones – internet on rig and connection to shore. Action closed.

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Odfjell/Halliburton Mud – Volume sensors in some tanks and pits are out of calibration

    Responsible for follow up: Stig Seland (Well Expertise). 29.08.19: all pit sensors are working as expected. Action closed.

  • Actions

    Closed


    Closed


    Deadline was:

    Odfjell/Halliburton mud – Only one hose in loading station common for OBM and WBM transfers from boat

    No plans of using deicated hose for WBM or OBM.

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Odfjell/Halliburton mud – Shelves for screen storage is being planned, screens are currently being stored on pallets on the floor

    Responsible for follow up: Stig Seland (Well Expertise). 29.08.19: screens shelves installed in shaker room. Action closed.

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Halliburton mud/PGNiG – Halliburton does not have the inhouse expertise to qualify the mud for finger printing. PGNiG to explain how this will be done, what characteristics are acceptable etc.

    Responsible for follow up: Stig Seland (Well Expertise). N/A, decided to use new mud for 12 1/4″ and 8 1/2″ sections.

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Halliburton mud – 20/80 W/O ratio: Slightly compromised sag stability might be indicating in testing. Check if acceptable with Halliburton mud.

    Responsible for follow up: Øystein Prytz (Well Expertise). 07.08.19: Mail correspondance with Duncan Clinch in Halliburton Baroid; Sagging is unlikely, only 17 degrees inclination planned. Action closed.

  • Actions

    Closed


    Closed


    Follow up action only.

    Halliburton mudlogging/Odfjell/Aker BP – Currently no phones in the DCR

    Responsible for follow up: Stig Seland (Well Expertise). 29.08.19: Phones installed. Action closed

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Halliburton mudlogging/Odfjell – Experienced some unexpected loss of power in the technical room during maintenance

    Responsible for follow up: Stig Seland (Well Expertise). 29.08.19: Planned maintenance work on VDF. Due to poor information, it wasn’t informed that the power went off in that area. Action closed.

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Halliburton mudlogging/Odfjell – Rig signal for Flow Out and Density Out is missing

    Responsible for follow up: Stig Seland (Well Expertise). 29.08.19: flow out available. Density from rig unavailable. Halliburton uses own MW sensors. Action closed.

  • Actions

    Closed


    Closed


    Deadline was:

    Halliburton DD/MWD/LWD/Odfjell – BHAs are made on the main rotary; aux has not enough height

    Responsible for follow up: Øystein Prytz (Well Expertise). 15.07.19: No aux on DSN, but BHA can be made up offline with torque master. The plan is to optimise this offline building capacity. Action closed.

  • Actions

    Closed


    Closed


    Halliburton to send substitution plan 2019 to PGNiG/WE

    Responsible for follow up: Christina Rødne (Well Expertise). Halliburton Substitution Plan 2019 received 25.06.2019. Closed out

  • Actions

    Closed


    Closed


    Update of Halliburton Measurement Program

    Responsible for follow up: Christina Rødne (Well Expertise). Sent M6 Guidance to Halliburton 15.07.2019. Action closed.

  • Actions

    Closed


    Closed


    Deadline was:

    There is no database to support transfer of lessons learned from project to project.

    Halliburton should evaluate to set up a data base which makes it possible to transfer lessons learned from project to project.

    N/A



Additional Documentation

PGNiG-Halliburton-Verification-20.06.19-SIGNED.pdf


PGNiG-Halliburton-Verification-20.06.19-SIGNED.pdf



\n”}}]}]}]},{“type”:”section”,”props”:{“class”:”uk-hidden”,”id”:”newreport”,”image_position”:”center-center”,”padding”:”none”,”style”:”default”,”title_breakpoint”:”xl”,”title_position”:”top-left”,”title_rotation”:”left”,”vertical_align”:””,”width”:”default”},”children”:[{“type”:”row”,”children”:[{“type”:”column”,”props”:{“image_position”:”center-center”,”position_sticky_breakpoint”:”m”},”children”:[{“type”:”html”,”props”:{“content”:”

\n

\n

New Audit Report