Wild Well Verification Report
Summary
A verification of Wild Well Controls capping stack services for the Shrek well was therefore performed to ensure a high level of quality and commitment to the Shrek project. Focus for the verification has been on operational preparedness, personnel competence, HSEQ reporting and implementation of lessons learned.
Findings
-
Follow up action only.
Wild Well Control to provide with technical and logistical input to the Blowout Contingency Plan for Shrek.
Responsible for follow up: Øystein Prytz (Well Expertise). Necessary input provided via e mail correspondance between Øystein Prytz and Barry Moir (Wild Well Control). Action Closed.
Additional Documentation
New Audit Report
\n
Wild Well

|
Report No.
|
1774 |
|
Type of audit
|
External Audits |
|
Auditee/Customer
|
Wild Well |
|
Date
|
2019/06/26 |
|
Findings
|
1 |
|
Status
|
Closed |
Wild Well Verification Report
Summary
A verification of Wild Well Controls capping stack services for the Shrek well was therefore performed to ensure a high level of quality and commitment to the Shrek project. Focus for the verification has been on operational preparedness, personnel competence, HSEQ reporting and implementation of lessons learned.
Findings
-
Follow up action only.
Wild Well Control to provide with technical and logistical input to the Blowout Contingency Plan for Shrek.
Responsible for follow up: Øystein Prytz (Well Expertise). Necessary input provided via e mail correspondance between Øystein Prytz and Barry Moir (Wild Well Control). Action Closed.