Review of Soiltech’s swarf and cuttings containment deliveries
Summary
Findings
-
N/A
Soiltech to include swarf in daily cuttings report
Performed
-
N/A
Soiltech to report tracking of cleaning (weight and volumes, meters milled)
Confirmed ok
-
N/A
Soiltech to check with DDAS:
•Power supply/emergency power for the swarf unit at a shut-down
•Length needed on the 16” hoseConfirmed ok
-
N/A
Soiltech to check hand tools and marking
Confirmed ok
-
N/A
DNO to inspect the systems when installed onboard BD –as part of rig intake
Confirmed ok
-
N/A
DNO to communicate plan (HAZOP) and section when milling is possible –so Soiltech can secure personnel
Confirmed ok
-
N/A
DNO to send PP&A programs to Soiltech
Performed
Additional Documentation
EA-2020-8_-Review-Report-Soiltech_-swarf-and-cuttings-deliveries.pdf
New Audit Report
\n
Soiltech AS

|
Report No.
|
1594 |
|
Type of audit
|
External Audits |
|
Auditee/Customer
|
Soiltech AS |
|
Date
|
2020/12/17 |
|
Findings
|
7 |
|
Status
|
Closed |
Review of Soiltech’s swarf and cuttings containment deliveries
Summary
Findings
-
N/A
Soiltech to include swarf in daily cuttings report
Performed
-
N/A
Soiltech to report tracking of cleaning (weight and volumes, meters milled)
Confirmed ok
-
N/A
Soiltech to check with DDAS:
•Power supply/emergency power for the swarf unit at a shut-down
•Length needed on the 16” hoseConfirmed ok
-
N/A
Soiltech to check hand tools and marking
Confirmed ok
-
N/A
DNO to inspect the systems when installed onboard BD –as part of rig intake
Confirmed ok
-
N/A
DNO to communicate plan (HAZOP) and section when milling is possible –so Soiltech can secure personnel
Confirmed ok
-
N/A
DNO to send PP&A programs to Soiltech
Performed
Additional Documentation