Mitsui

|
Report No.
|
1694 |
|
Type of audit
|
External Audits |
|
Auditee/Customer
|
Mitsui |
|
Date
|
2020/08/10 |
|
Findings
|
4 |
|
Status
|
Closed |
Mitsui Delivery Process – Well Management
Summary
All persons involved from Mitsui and SCMS were helpful and positive during the verification.
The verification started with an opening meeting were Wellesley/presented the Schweinsteiger project and scope for the verification. Then, Mitsui presented the different topics requested in the notification letter, followed up by questions from Wellesley/WE. A site visit at the Fjordbase was then carried out after the meeting. The verification was summarised and findings presented in the closing meeting at the end of the day.
The verification team identified four (4) findings, which included two (2) observations and two (2) improvement points. The findings are described in chapter 4 and summed up in an action list for follow up in chapter 5. The overall impression of the verification was positive and none of the findings were considered critical for the Schweinsteiger operation.
Findings
-
A QMS bridging document between Mitsui and SCM was not prepared
Prepare a QMS bridging document between Mitsui and SCMS
ok
-
A Quality Plan for the contract was not prepared
Prepare a Quality plan for the contract
ok
-
A procedure for handling changes should be prepared (MOC)
Prepare a MOC procedure for how to handle changes
ok
-
The quality manual and some other procedures received is does not have proper identification, such as Company name and document no.
Prepare a document coding procedure that describes how documents should be identified
ok
Additional Documentation
New Audit Report
\n
Mitsui

|
Report No.
|
1694 |
|
Type of audit
|
External Audits |
|
Auditee/Customer
|
Mitsui |
|
Date
|
2020/08/10 |
|
Findings
|
4 |
|
Status
|
Closed |
Mitsui Delivery Process – Well Management
Summary
All persons involved from Mitsui and SCMS were helpful and positive during the verification.
The verification started with an opening meeting were Wellesley/presented the Schweinsteiger project and scope for the verification. Then, Mitsui presented the different topics requested in the notification letter, followed up by questions from Wellesley/WE. A site visit at the Fjordbase was then carried out after the meeting. The verification was summarised and findings presented in the closing meeting at the end of the day.
The verification team identified four (4) findings, which included two (2) observations and two (2) improvement points. The findings are described in chapter 4 and summed up in an action list for follow up in chapter 5. The overall impression of the verification was positive and none of the findings were considered critical for the Schweinsteiger operation.
Findings
-
A QMS bridging document between Mitsui and SCM was not prepared
Prepare a QMS bridging document between Mitsui and SCMS
ok
-
A Quality Plan for the contract was not prepared
Prepare a Quality plan for the contract
ok
-
A procedure for handling changes should be prepared (MOC)
Prepare a MOC procedure for how to handle changes
ok
-
The quality manual and some other procedures received is does not have proper identification, such as Company name and document no.
Prepare a document coding procedure that describes how documents should be identified
ok
Additional Documentation