Dolphin Drilling

No person selected
|
Report No.
|
1710 |
|
Type of audit
|
Rig Intake |
|
Auditee/Customer
|
Dolphin Drilling |
|
Date
|
2020/07/01 |
|
Findings
|
0 |
|
Status
|
Closed |
Rig Visit Verification Report
Summary
The Rig Intake Team (RIT) would like to acknowledge the support provided by Dolphin personnel during the
verification. All persons involved from Dolphin were helpful and positive. The rig was in Feda to pick up
equipment for the Schweinsteiger well. During the verification, none of the service providers were present.
Wellesley plan to install a Soiltech unit for slops handling and vacuum cleaning and Schlumberger unit for
wireline operations. Follow up of the service providers and the installation work will be done on the next
rig visit/verification in August.
A site inspection was carried out after the opening meeting. The general impression is that this is a well
function rig. Housekeeping was good despite being in between wells with ongoing maintenance work and
equipment installations to get ready for the Schweinsteiger operation.
The RIT identified 31 findings, which included 3 non-conformances and 28 observations. The findings are
described in chapter 0 and summed up in an action list for follow up in chapter 0. The overall impression of
the verification was positive and none of the findings are considered critical for the Schweinsteiger
operation
verification. All persons involved from Dolphin were helpful and positive. The rig was in Feda to pick up
equipment for the Schweinsteiger well. During the verification, none of the service providers were present.
Wellesley plan to install a Soiltech unit for slops handling and vacuum cleaning and Schlumberger unit for
wireline operations. Follow up of the service providers and the installation work will be done on the next
rig visit/verification in August.
A site inspection was carried out after the opening meeting. The general impression is that this is a well
function rig. Housekeeping was good despite being in between wells with ongoing maintenance work and
equipment installations to get ready for the Schweinsteiger operation.
The RIT identified 31 findings, which included 3 non-conformances and 28 observations. The findings are
described in chapter 0 and summed up in an action list for follow up in chapter 0. The overall impression of
the verification was positive and none of the findings are considered critical for the Schweinsteiger
operation
Additional Documentation
EA-2020-9_Rig-Visit-Verification-Report-Borgland-Dolphin.pdf
New Audit Report
You do not have permission to view this form.
\n
Dolphin Drilling

No person selected
|
Report No.
|
1710 |
|
Type of audit
|
Rig Intake |
|
Auditee/Customer
|
Dolphin Drilling |
|
Date
|
2020/07/01 |
|
Findings
|
0 |
|
Status
|
Closed |
Rig Visit Verification Report
Summary
The Rig Intake Team (RIT) would like to acknowledge the support provided by Dolphin personnel during the
verification. All persons involved from Dolphin were helpful and positive. The rig was in Feda to pick up
equipment for the Schweinsteiger well. During the verification, none of the service providers were present.
Wellesley plan to install a Soiltech unit for slops handling and vacuum cleaning and Schlumberger unit for
wireline operations. Follow up of the service providers and the installation work will be done on the next
rig visit/verification in August.
A site inspection was carried out after the opening meeting. The general impression is that this is a well
function rig. Housekeeping was good despite being in between wells with ongoing maintenance work and
equipment installations to get ready for the Schweinsteiger operation.
The RIT identified 31 findings, which included 3 non-conformances and 28 observations. The findings are
described in chapter 0 and summed up in an action list for follow up in chapter 0. The overall impression of
the verification was positive and none of the findings are considered critical for the Schweinsteiger
operation
verification. All persons involved from Dolphin were helpful and positive. The rig was in Feda to pick up
equipment for the Schweinsteiger well. During the verification, none of the service providers were present.
Wellesley plan to install a Soiltech unit for slops handling and vacuum cleaning and Schlumberger unit for
wireline operations. Follow up of the service providers and the installation work will be done on the next
rig visit/verification in August.
A site inspection was carried out after the opening meeting. The general impression is that this is a well
function rig. Housekeeping was good despite being in between wells with ongoing maintenance work and
equipment installations to get ready for the Schweinsteiger operation.
The RIT identified 31 findings, which included 3 non-conformances and 28 observations. The findings are
described in chapter 0 and summed up in an action list for follow up in chapter 0. The overall impression of
the verification was positive and none of the findings are considered critical for the Schweinsteiger
operation
Additional Documentation
EA-2020-9_Rig-Visit-Verification-Report-Borgland-Dolphin.pdf
\n