Verification Report- IKM Cleandrill 2018 – MRR System

Type of audit

External Audits
IKM

Auditee/Customer

IKM
Wellesley Petroleum AS

Date

2018/03/07

2834 days ago

Findings

4
Number of findings

Status

Closed
External Audits


Verification Report- IKM Cleandrill 2018 – MRR System
Summary

Reference is made to the notification sent 7
th March 2018 with regards to the Well Expertise and Wellesley’s
Verification to be conducted at IKM Cleandrill’s premises at Straume in Bergen.
The verification was conducted 15th March. Wellesley and Well Expertise were impressed by the attention and
preparation given to the verification and are grateful to all concerned.
IKM Cleandrill’s MRR systems have been developed over a significant period of time and are thus functioning
well. However, equipment upgrades such as hydraulic fences on the LARS unit enhances the impression on IKM
Cleandrill’s commitment with regards to continual improvement and safe performance.
There were no non-conformances recorded, however one observation and three improvement suggestions
were recorded.
The commitment from managerial positions to participate in operational meetings and being “hands on” and
proactive in delivery a full service is something we can only encourage continues.

Findings

  • Observation

    Closed


    Closed


    Deadline was:

    IKM internal handover report, not signed off for
    Transocean Arctic “Raudåsen” 05.03.18.
    Awareness of filling in report and signing off.

  • Improvement

    Closed


    Closed


    Deadline was:

    Try to combine IKM’s customer satisfaction
    sheet with KPI form from Wellesley.

  • Improvement

    Closed


    Closed


    Deadline was:

    Equipment launching procedure should include
    that one should not stop at a depth where
    equipment can come in contact with pontoons
    of the rig and potentially get damaged. Include
    in procedure and pre-job briefing.

  • Improvement

    Closed


    Closed


    Deadline was:

    Update client input sheet with area specific
    information and planned mud info.
    Proactive involvement in ensuring value for
    operator in using MRR.



Additional Documentation

Verification-Report-IKM-Cleandrill-2018-Rev-00_signed.pdf


Verification-Report-IKM-Cleandrill-2018-Rev-00_signed.pdf




New Audit Report

You do not have permission to view this form.


\n


IKM

No person selected

Report No.

1719
Verification Report- IKM Cleandrill 2018 – MRR System

Type of audit

External Audits
IKM

Auditee/Customer

IKM
Wellesley Petroleum AS

Date

2018/03/07

2834 days ago

Findings

4
Number of findings

Status

Closed
External Audits


Verification Report- IKM Cleandrill 2018 – MRR System
Summary

Reference is made to the notification sent 7
th March 2018 with regards to the Well Expertise and Wellesley’s
Verification to be conducted at IKM Cleandrill’s premises at Straume in Bergen.
The verification was conducted 15th March. Wellesley and Well Expertise were impressed by the attention and
preparation given to the verification and are grateful to all concerned.
IKM Cleandrill’s MRR systems have been developed over a significant period of time and are thus functioning
well. However, equipment upgrades such as hydraulic fences on the LARS unit enhances the impression on IKM
Cleandrill’s commitment with regards to continual improvement and safe performance.
There were no non-conformances recorded, however one observation and three improvement suggestions
were recorded.
The commitment from managerial positions to participate in operational meetings and being “hands on” and
proactive in delivery a full service is something we can only encourage continues.

Findings

  • Observation

    Closed


    Closed


    Deadline was:

    IKM internal handover report, not signed off for
    Transocean Arctic “Raudåsen” 05.03.18.
    Awareness of filling in report and signing off.

  • Improvement

    Closed


    Closed


    Deadline was:

    Try to combine IKM’s customer satisfaction
    sheet with KPI form from Wellesley.

  • Improvement

    Closed


    Closed


    Deadline was:

    Equipment launching procedure should include
    that one should not stop at a depth where
    equipment can come in contact with pontoons
    of the rig and potentially get damaged. Include
    in procedure and pre-job briefing.

  • Improvement

    Closed


    Closed


    Deadline was:

    Update client input sheet with area specific
    information and planned mud info.
    Proactive involvement in ensuring value for
    operator in using MRR.



Additional Documentation

Verification-Report-IKM-Cleandrill-2018-Rev-00_signed.pdf


Verification-Report-IKM-Cleandrill-2018-Rev-00_signed.pdf



\n”}}]}]}]},{“type”:”section”,”props”:{“class”:”uk-hidden”,”id”:”newreport”,”image_position”:”center-center”,”padding”:”none”,”style”:”default”,”title_breakpoint”:”xl”,”title_position”:”top-left”,”title_rotation”:”left”,”vertical_align”:””,”width”:”default”},”children”:[{“type”:”row”,”children”:[{“type”:”column”,”props”:{“image_position”:”center-center”,”position_sticky_breakpoint”:”m”},”children”:[{“type”:”html”,”props”:{“content”:”