Deepsea Nordkapp – Rig Intake – DP verification

Type of audit

Rig Intake
Odfjell Drilling

Auditee/Customer

Odfjell Drilling
OKEA

Date

2024/12/11

361 days ago

Findings

1
Number of findings

Status

Closed
Rig Intake


Deepsea Nordkapp – Rig Intake – DP verification
Summary

The Deepsea Nordkapp DP Documentation has been subjected to a detailed review at the request of Okea ASA. This review has been conducted under the guidelines established in IMO and IMCA publications.
The documentation that has been reviewed is as follows:
1) DP FMEA: GM-PRJ106232-DP-FMEA-0001 Rev 4
2) March 2024 DP Trials: GM-PRJ115848-DP-TRL-0001 Rev 2
3) WSOG provided by Odfell Drilling
4) Equivalent to CAMO provided by Odfell Drilling
It is verified that the Deepsea Nordkapp is in compliance with the guidelines established in IMO and IMCA publications based on the documentation reviewed as listed above with the following exceptions:
1) No exceptions
These exceptions have been mitigated by:
1) Not applicable
The vessel is suitable for DP equipment class 1, 2 or 3 activities.
Well Specific Operating Guidelines (WSOG) and suitable system configurations as listed in the document entitled “CAMO Equivalent” have been established for top hole drilling activities.

Findings

  • Observation

    Closed


    Closed


    Deadline was:

    There are 8 findings showing as open. What is the status of these, especially those relating to HAIN and LWTW?

    MdB 02/12/24 HAIN has been repaired. LWTW has been removed. The other findings are not considered a significant risk to the project.



Additional Documentation


Deepsea-Nordkapp-WSOG.pdf, Deepsea-Nordkapp-DP-Action-Tracker-MdB-17.10.19.xlsx, Deepsea-Nordkapp-CAMO-equivalent.xlsx, Deepsea-Nordkapp-March-2024-DP-Trials.pdf, Deepsea-Nordkapp-Statement-of-Verification.pdf




New Audit Report

You do not have permission to view this form.


\n


Odfjell Drilling

No person selected

Report No.

7700
Deepsea Nordkapp – Rig Intake – DP verification

Type of audit

Rig Intake
Odfjell Drilling

Auditee/Customer

Odfjell Drilling
OKEA

Date

2024/12/11

361 days ago

Findings

1
Number of findings

Status

Closed
Rig Intake


Deepsea Nordkapp – Rig Intake – DP verification
Summary

The Deepsea Nordkapp DP Documentation has been subjected to a detailed review at the request of Okea ASA. This review has been conducted under the guidelines established in IMO and IMCA publications.
The documentation that has been reviewed is as follows:
1) DP FMEA: GM-PRJ106232-DP-FMEA-0001 Rev 4
2) March 2024 DP Trials: GM-PRJ115848-DP-TRL-0001 Rev 2
3) WSOG provided by Odfell Drilling
4) Equivalent to CAMO provided by Odfell Drilling
It is verified that the Deepsea Nordkapp is in compliance with the guidelines established in IMO and IMCA publications based on the documentation reviewed as listed above with the following exceptions:
1) No exceptions
These exceptions have been mitigated by:
1) Not applicable
The vessel is suitable for DP equipment class 1, 2 or 3 activities.
Well Specific Operating Guidelines (WSOG) and suitable system configurations as listed in the document entitled “CAMO Equivalent” have been established for top hole drilling activities.

Findings

  • Observation

    Closed


    Closed


    Deadline was:

    There are 8 findings showing as open. What is the status of these, especially those relating to HAIN and LWTW?

    MdB 02/12/24 HAIN has been repaired. LWTW has been removed. The other findings are not considered a significant risk to the project.



Additional Documentation


Deepsea-Nordkapp-WSOG.pdf, Deepsea-Nordkapp-DP-Action-Tracker-MdB-17.10.19.xlsx, Deepsea-Nordkapp-CAMO-equivalent.xlsx, Deepsea-Nordkapp-March-2024-DP-Trials.pdf, Deepsea-Nordkapp-Statement-of-Verification.pdf



\n”}}]}]}]},{“type”:”section”,”props”:{“class”:”uk-hidden”,”id”:”newreport”,”image_position”:”center-center”,”padding”:”none”,”style”:”default”,”title_breakpoint”:”xl”,”title_position”:”top-left”,”title_rotation”:”left”,”vertical_align”:””,”width”:”default”},”children”:[{“type”:”row”,”children”:[{“type”:”column”,”props”:{“image_position”:”center-center”,”position_sticky_breakpoint”:”m”},”children”:[{“type”:”html”,”props”:{“content”:”

\n

\n

New Audit Report