Odfjell Drilling
|
Report No.
|
7700 |
|
Type of audit
|
Rig Intake |
|
Auditee/Customer
|
Odfjell Drilling |
|
Date
|
2024/12/11 |
|
Findings
|
1 |
|
Status
|
Closed |
Deepsea Nordkapp – Rig Intake – DP verification
Summary
The documentation that has been reviewed is as follows:
1) DP FMEA: GM-PRJ106232-DP-FMEA-0001 Rev 4
2) March 2024 DP Trials: GM-PRJ115848-DP-TRL-0001 Rev 2
3) WSOG provided by Odfell Drilling
4) Equivalent to CAMO provided by Odfell Drilling
It is verified that the Deepsea Nordkapp is in compliance with the guidelines established in IMO and IMCA publications based on the documentation reviewed as listed above with the following exceptions:
1) No exceptions
These exceptions have been mitigated by:
1) Not applicable
The vessel is suitable for DP equipment class 1, 2 or 3 activities.
Well Specific Operating Guidelines (WSOG) and suitable system configurations as listed in the document entitled “CAMO Equivalent” have been established for top hole drilling activities.
Findings
-
There are 8 findings showing as open. What is the status of these, especially those relating to HAIN and LWTW?
MdB 02/12/24 HAIN has been repaired. LWTW has been removed. The other findings are not considered a significant risk to the project.
New Audit Report
\n
Odfjell Drilling
|
Report No.
|
7700 |
|
Type of audit
|
Rig Intake |
|
Auditee/Customer
|
Odfjell Drilling |
|
Date
|
2024/12/11 |
|
Findings
|
1 |
|
Status
|
Closed |
Deepsea Nordkapp – Rig Intake – DP verification
Summary
The documentation that has been reviewed is as follows:
1) DP FMEA: GM-PRJ106232-DP-FMEA-0001 Rev 4
2) March 2024 DP Trials: GM-PRJ115848-DP-TRL-0001 Rev 2
3) WSOG provided by Odfell Drilling
4) Equivalent to CAMO provided by Odfell Drilling
It is verified that the Deepsea Nordkapp is in compliance with the guidelines established in IMO and IMCA publications based on the documentation reviewed as listed above with the following exceptions:
1) No exceptions
These exceptions have been mitigated by:
1) Not applicable
The vessel is suitable for DP equipment class 1, 2 or 3 activities.
Well Specific Operating Guidelines (WSOG) and suitable system configurations as listed in the document entitled “CAMO Equivalent” have been established for top hole drilling activities.
Findings
-
There are 8 findings showing as open. What is the status of these, especially those relating to HAIN and LWTW?
MdB 02/12/24 HAIN has been repaired. LWTW has been removed. The other findings are not considered a significant risk to the project.