Wild Well Verification Report

Type of audit

External Audits
Wild Well

Auditee/Customer

Wild Well
PGNIG Upstream Norway

Date

2019/06/26

2357 days ago

Findings

1
Number of findings

Status

Closed
External Audits


Wild Well Verification Report
Summary

There is a PGNiG and legislative requirement to establish a contract for access to Capping Stack and related services for the upcoming Shrek well. Access to equipment to cap a flowing well is required by regulations and guidelines (PSA Activity Regulation § 86 and NORSOK D 010).
A verification of Wild Well Controls capping stack services for the Shrek well was therefore performed to ensure a high level of quality and commitment to the Shrek project. Focus for the verification has been on operational preparedness, personnel competence, HSEQ reporting and implementation of lessons learned.

Findings

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Wild Well Control to provide with technical and logistical input to the Blowout Contingency Plan for Shrek.

    Responsible for follow up: Øystein Prytz (Well Expertise). Necessary input provided via e mail correspondance between Øystein Prytz and Barry Moir (Wild Well Control). Action Closed.



Additional Documentation

PGNiG-Wild-Well-Verification-26.06.19-SIGNED.pdf


PGNiG-Wild-Well-Verification-26.06.19-SIGNED.pdf




New Audit Report

You do not have permission to view this form.


\n


Wild Well

No person selected

Report No.

1774
Wild Well Verification Report

Type of audit

External Audits
Wild Well

Auditee/Customer

Wild Well
PGNIG Upstream Norway

Date

2019/06/26

2357 days ago

Findings

1
Number of findings

Status

Closed
External Audits


Wild Well Verification Report
Summary

There is a PGNiG and legislative requirement to establish a contract for access to Capping Stack and related services for the upcoming Shrek well. Access to equipment to cap a flowing well is required by regulations and guidelines (PSA Activity Regulation § 86 and NORSOK D 010).
A verification of Wild Well Controls capping stack services for the Shrek well was therefore performed to ensure a high level of quality and commitment to the Shrek project. Focus for the verification has been on operational preparedness, personnel competence, HSEQ reporting and implementation of lessons learned.

Findings

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Wild Well Control to provide with technical and logistical input to the Blowout Contingency Plan for Shrek.

    Responsible for follow up: Øystein Prytz (Well Expertise). Necessary input provided via e mail correspondance between Øystein Prytz and Barry Moir (Wild Well Control). Action Closed.



Additional Documentation

PGNiG-Wild-Well-Verification-26.06.19-SIGNED.pdf


PGNiG-Wild-Well-Verification-26.06.19-SIGNED.pdf



\n”}}]}]}]},{“type”:”section”,”props”:{“class”:”uk-hidden”,”id”:”newreport”,”image_position”:”center-center”,”padding”:”none”,”style”:”default”,”title_breakpoint”:”xl”,”title_position”:”top-left”,”title_rotation”:”left”,”vertical_align”:””,”width”:”default”},”children”:[{“type”:”row”,”children”:[{“type”:”column”,”props”:{“image_position”:”center-center”,”position_sticky_breakpoint”:”m”},”children”:[{“type”:”html”,”props”:{“content”:”

\n

\n

New Audit Report