Findings

6
Number of findings

Status

Closed
External Audits


Well Expertise Verification Report- Saga Fjordbase
Summary

Reference is made to agreement by phone and notification sent to Saga Fjordbase 16th June 2017 with regards
to the Well Expertise and Wellesley Petroleum Verification at Saga Fjordbase premises in Florø.
The verification was conducted 28th June. Well Expertise and Wellesley were impressed by the attention and
preparation given to the verification. All responses met, or were above, our expectations.
There were no non-conformances, two observations and four improvement points recorded.
The commitment from managerial positions and project coordinators being “hands on” to deliver a first-class
logistics setup is something we can only encourage continues.

Findings

  • Observation

    Closed


    Closed


    Deadline was:

    Saga Fjordbase have two procedures for the receipt and handling of materials and CCUs. According to
    the “NOG-091 Appendix 4 Decision table” a certain percentage of CCUs shall be randomly selected and
    checked. The Saga Fjordbase procedures differ in the named percentage (5 % and 10 %).
    The verification team suggests Saga Fjordbase revise their procedures to reflect the correct number 5
    %. Wellesley do not have any requirements for a higher percentage randomly selected CCUs.

  • Observation

    Closed


    Closed


    Deadline was:

    On previous operations waste declarations have been changed/reclassified by SAR on www.
    avfallsdeklarering.no after waste has been received onshore at supply base. (E.g. waste re-declared to
    Oil Based Mud on operations where OBM hasn`t been used.)

    The verification team suggests SAR look at their procedures for declaring waste and secure that
    deviations or changes are discussed with the operator before changes are made at avfallsdeklarering.no. Then the operator is given the chance to discuss and check the declaration. If the waste
    is incorrectly reported from offshore, a deviation report must be written and sent to operator before the
    time limit for doing changes (10 days) is exceeded at avfallsdeklarering.no.

  • Improvement

    Closed


    Closed


    Deadline was:

    The fact that Saga Fjordbase is ISO 14001 certified does not come clearly across in the submitted
    documentation.

    The verification team suggests that Saga Fjordbase review the description of their Management system
    and include ISO 14001 reference and environmental focus. For future verifications, submitting the ISO
    certificates may be smart when sending requested information.

  • Improvement

    Closed


    Closed


    Deadline was:

    Ref. HMSK Plan 2017, page 8: How does Saga Fjordbase secure achievement of objectives
    (måloppnåelse)?
    The verification team thinks that achievement of goals/objectives should be part of the agenda under
    ‘Forbedringsprosjekt’. It is important that status on goals and objectives are communicated to ensure
    that the personnel is aware of the goals and how each of them can contribute. It seems like this is
    covered through meetings and also in personnel appraisals (‘medarbeidersamtaler’), so the
    improvement suggestion is to update the HMSK Plan.

  • Improvement

    Closed


    Closed


    Deadline was:

    Saga Fjordbase do not have any procedures other than a written handover when going from normal
    working hours and dedicated logistics coordinator, to duty personnel.

    The verification team suggests Saga Fjordbase set up procedures where personnel overlap or have a
    formal check list to ensure all personnel are familiar with upcoming operations.

  • Improvement

    Closed


    Closed


    Deadline was:

    Saga Fjordbase to consider audit/verification of Bring.

    The verification team suggests Saga Fjordbase perform an audit/verification of Bring to ensure transport
    for the Goanna well is performed in a safe and efficient manner. Wellesley to provide estimated
    tonnage, information on CCUs and potential special transport for the coming operations.



Additional Documentation


VERIFI1.pdf, AUDITR1.pdf, ACHILL1.pdf




New Audit Report

You do not have permission to view this form.


\n


Saga Fjordbase

No person selected

Report No.

1801
Well Expertise Verification Report- Saga Fjordbase

Type of audit

External Audits
Saga Fjordbase

Auditee/Customer

Saga Fjordbase
Wellesley Petroleum AS

Date

2017/06/16

3097 days ago

Findings

6
Number of findings

Status

Closed
External Audits


Well Expertise Verification Report- Saga Fjordbase
Summary

Reference is made to agreement by phone and notification sent to Saga Fjordbase 16th June 2017 with regards
to the Well Expertise and Wellesley Petroleum Verification at Saga Fjordbase premises in Florø.
The verification was conducted 28th June. Well Expertise and Wellesley were impressed by the attention and
preparation given to the verification. All responses met, or were above, our expectations.
There were no non-conformances, two observations and four improvement points recorded.
The commitment from managerial positions and project coordinators being “hands on” to deliver a first-class
logistics setup is something we can only encourage continues.

Findings

  • Observation

    Closed


    Closed


    Deadline was:

    Saga Fjordbase have two procedures for the receipt and handling of materials and CCUs. According to
    the “NOG-091 Appendix 4 Decision table” a certain percentage of CCUs shall be randomly selected and
    checked. The Saga Fjordbase procedures differ in the named percentage (5 % and 10 %).
    The verification team suggests Saga Fjordbase revise their procedures to reflect the correct number 5
    %. Wellesley do not have any requirements for a higher percentage randomly selected CCUs.

  • Observation

    Closed


    Closed


    Deadline was:

    On previous operations waste declarations have been changed/reclassified by SAR on www.
    avfallsdeklarering.no after waste has been received onshore at supply base. (E.g. waste re-declared to
    Oil Based Mud on operations where OBM hasn`t been used.)

    The verification team suggests SAR look at their procedures for declaring waste and secure that
    deviations or changes are discussed with the operator before changes are made at avfallsdeklarering.no. Then the operator is given the chance to discuss and check the declaration. If the waste
    is incorrectly reported from offshore, a deviation report must be written and sent to operator before the
    time limit for doing changes (10 days) is exceeded at avfallsdeklarering.no.

  • Improvement

    Closed


    Closed


    Deadline was:

    The fact that Saga Fjordbase is ISO 14001 certified does not come clearly across in the submitted
    documentation.

    The verification team suggests that Saga Fjordbase review the description of their Management system
    and include ISO 14001 reference and environmental focus. For future verifications, submitting the ISO
    certificates may be smart when sending requested information.

  • Improvement

    Closed


    Closed


    Deadline was:

    Ref. HMSK Plan 2017, page 8: How does Saga Fjordbase secure achievement of objectives
    (måloppnåelse)?
    The verification team thinks that achievement of goals/objectives should be part of the agenda under
    ‘Forbedringsprosjekt’. It is important that status on goals and objectives are communicated to ensure
    that the personnel is aware of the goals and how each of them can contribute. It seems like this is
    covered through meetings and also in personnel appraisals (‘medarbeidersamtaler’), so the
    improvement suggestion is to update the HMSK Plan.

  • Improvement

    Closed


    Closed


    Deadline was:

    Saga Fjordbase do not have any procedures other than a written handover when going from normal
    working hours and dedicated logistics coordinator, to duty personnel.

    The verification team suggests Saga Fjordbase set up procedures where personnel overlap or have a
    formal check list to ensure all personnel are familiar with upcoming operations.

  • Improvement

    Closed


    Closed


    Deadline was:

    Saga Fjordbase to consider audit/verification of Bring.

    The verification team suggests Saga Fjordbase perform an audit/verification of Bring to ensure transport
    for the Goanna well is performed in a safe and efficient manner. Wellesley to provide estimated
    tonnage, information on CCUs and potential special transport for the coming operations.



Additional Documentation


VERIFI1.pdf, AUDITR1.pdf, ACHILL1.pdf



\n”}}]}]}]},{“type”:”section”,”props”:{“class”:”uk-hidden”,”id”:”newreport”,”image_position”:”center-center”,”padding”:”none”,”style”:”default”,”title_breakpoint”:”xl”,”title_position”:”top-left”,”title_rotation”:”left”,”vertical_align”:””,”width”:”default”},”children”:[{“type”:”row”,”children”:[{“type”:”column”,”props”:{“image_position”:”center-center”,”position_sticky_breakpoint”:”m”},”children”:[{“type”:”html”,”props”:{“content”:”