Report No.

5961
PUN Rig intake review meeting

Type of audit

Rig Intake
Odfjell

Auditee/Customer

Odfjell
PUN

Date

2023/11/10

759 days ago

Findings

20
Number of findings

Status

Closed
Rig Intake


PUN Rig intake review meeting
Summary

As a part of the rig intake and preparations for the Tomcat HPHT exploration well, PGNiG Upstream Norway AS (PUN) performed an onshore review of Odfjell Drilling AS (Odfjell) on both HSE- and technical aspects.
The Review was held at Odfjell’s premises at Kokstadflaten 35 in Bergen.
The review was held in a good atmosphere, the Odfjell participants were very open and willing to explain and share information.
The verification team identified one (1) non-conformity, zero (0) improvement points, zero (0) observations and 23 actions. The findings are listed I Chapter 4.
Odfjell is requested to respond within two weeks of receiving this report on how they intended to handle the findings and sending PUN the required information.
The verification team’s impression is that Odfjell is a rig company that has a well-functioning business management system. Odfjell is ISO 9001, 14001 certified and the management system is prepared according to ISO 45001 and 50014. A separate competence review meeting will be scheduled closer to spud.

Findings

  • Non-Conformity

    Closed


    Closed


    Deadline was:

    IOGP 476 has requirements for level one for roustabouts, crane operators and deck crew. Level 2 requirements for Roughneck, subsea eng. and derrickman.
    Odfjell has a non-conformance from IOGP 476 related to level 1 for crane operator, and deck crew and level 2 for derrickman and roughneck. Although IOGP 476 is a guideline, PSA communicated during previous audits of Wellesley and DNO that this is now a requirement.

    Odfjell to send information how to comply.

    Odfjell have evaluated the requirements and concluded:

    Deck crew and crane operators will take level 1. This is an digital course. dec crew that have drilling education will get a deviation according to IOGP (qualifying examples of work related experience that may lead to considereing dispensation includes – regional vocational training schemes, dvs yrkesrettet utdanning)

    Roughneck and Derrickman are covered by the education VK2 well technique or equivalent drilling course/education.

  • Actions

    Closed


    Closed


    Deadline was:

    A-1: Competence review meeting to be scheduled 1 month before spud.

    20.02.2024 ÅKP: Spud is posponed to september.
    ÅKP. A competence review meeting was held 16.04.2024, se MoM attached

  • Actions

    Closed


    Closed


    Deadline was:

    A-2: A copy of following internal deviations is requested:
    215012
    222822
    228564
    228566
    228568
    228542

    08.12.2023 ÅKP. One requested synergi numer was wrong (228542) It should be 228842. Received

  • Actions

    Closed


    Closed


    Deadline was:

    A-3: Review agenda for Bi-weekly HSE meeting.

    20.02.2024 ÅKP: Ageda will remain, however a more efficient meeting is the new way (30 min).
    Tuesdays at 10:30

  • Actions

    Closed


    Closed


    Deadline was:

    A-4: List of open synergi cases

    Forward list of open synergi cases for DSY

    Open synergi cases are uploaded to dataroom. 27 cases registered and 19 of these were registered as medium risk.

  • Actions

    Closed


    Closed


    Deadline was:

    A-5: Odfjell to forward plan for organisational and
    operational barriers to be visualised

    05.04.24: OD are using manual barrier board and have not got any findings from Havtil on this. They are however looking at several new options to display barriers as a digital solution.

  • Actions

    Closed


    Closed


    Deadline was:

    A-6: New class status report to be sent when
    conditions are closed.

    ÅKP: Class status report 15.01.2024

  • Actions

    Closed


    Closed


    Deadline was:

    A-7: External audit plan (Odfjell’s verification plan
    towards suppliers) to be forwarded.

    Received: 4services, Afrishore and Puglisevich was on the plan in 2023

  • Actions

    Closed


    Closed


    Deadline was:

    A-8: Send information regarding level 1 and 2 course.
    Odfjell to send justification for requirements related to IOGP476.

    Level 1 is a digital course. The Level 1 course has 7 modules which cover the following topics:

    -Overview of Oil and Gas
    -Life Cycle of a Well
    -Drilling Rigs
    -Well Control During Drilling Operations
    -Well Intervention and Workover
    -Pressure Control During Well Intervention
    Conclusion.

    At the end of each module there is a knowledge check which candidate must successfully complete before moving on to the final exam. If a pass mark of 70% or more is achieved in the final exam candidates will be able to access their online certificate.

    Deck, Ass. crane driver will take level 1 course. deck personnel that have drilling course/drilling technical education gets dispensation.
    Roughneck, derrick man is coverd by the fagutdanning VKS2 brønn teknikk or similar accoring to Offshore Norge guideline 024.

  • Actions

    Closed


    Closed


    Deadline was:

    A-9: DROPS survey from Axess to be sent with status on findings. Both report and Synergi to be sent.

    13.11.2023 Received

  • Actions

    Closed


    Closed


    Deadline was:

    A-10: Experience with screen washer from DSN to be communicated.

    Mail from Odfjell 08.12.2023: VI har pr i dag en screenwasher men vi undersøker hvilke modeler som er mest egnet et DSY pga brukervennlighet og best egnet plassering i shaker)
    20.02.2024 ÅKP: Odfjell har ikke offisielt landet på noen avgjørelse om screen washer helt enda, men det kan se ut som om de ikke ønsker å ha dette på DSY pr. nå.

  • Actions

    Closed


    Closed


    Deadline was:

    A-11: Forward HAVS procedure when ready.

    Received: 08.12.2023

  • Actions

    Closed


    Closed


    Deadline was:

    A-12: Update measurement program with Biobar 32
    usage

    Send updated measurement program

    ÅKP 07.02.2024 Received. version 7

  • Actions

    Closed


    Closed


    Deadline was:

    A-13: Forward overview document over all
    equipment and energy consumption

    Received by email 08.12.23

  • Actions

    Closed


    Closed


    Deadline was:

    A-14: Forward all energy saving initiatives planned
    for DSY

    Received by email 08.12.23

  • Actions

    Closed


    Closed


    Deadline was:

    A-15: Prepare L3 procedure for handling of drones within 500m zone. What do one do if the drone lands on the rig?

    Received 08.03.2023. Not a procedure but a presentation of what to do… (Handlingsmønster)

  • Actions

    Closed


    Closed


    Deadline was:

    A-16: Follow-up of maintenance numbers

    03.04.24: New numbers to be reviewed closer to RTO.
    04.11.2024 ÅKP. Status:
    Overdue corrective work orders (CWO) that are safety critical elements (SCE): 1 (0)
    Overdue planned work orders that are SCE: 0 (26) (low and medium priority WOs)
    Open CWO that are SCE: 173 (33)
    Open planned WO that are SCE: 125 (382)
    Open CWO that are not SCE: 72 (202)
    Total open planned WO that are not SCE: 551 (4915)

  • Actions

    Closed


    Closed


    Deadline was:

    A-17: Send updated helideck certificate

    Received 19.02.2024

  • Actions

    Closed


    Closed


    Deadline was:

    A-18: Odfjell to inform RIT on timing for startup of
    maintenance on diesel generators in due time.

    05.04.24: Current plan is to do this work in November. Need to inform PGNiG to avoid interrupting any work.
    18.12.24 One taken during SPS. Next is during May/June. An will not effect Tomcat or Kjøttkake.

  • Actions

    Closed


    Closed


    Deadline was:

    A-19: Findings from the Cranes and lifting verification to be followed up.

    03.04.24: This is being followed. Please refer to 6009 Vår Lifting Verification.



Additional Documentation


PGNIG-TOMC-D-RA-0012-Odfjell-Rig-Intake-Review-Meeting-Report-26th-of-September.pdf, 215012.pdf, 222822.pdf, 228564.pdf, 228566.pdf, 228568.pdf, 234592-NC-1-IOGP-476.pdf, 234594.pdf, OD-Handlingsmonster-ved-droneaktivitet-1.pptx, EXPOSURE-TO-NOISE-AND-VIBRATION-FROM-HAND-HELD-TOOLS.pdf, 258034-16-278-01-Picture-log-Findings-DROPS-inspection.pdf, 258034-16-272-01-Field-Service-Report.pdf, Deepsea-Yantai-Certificate-2023.pdf, MOM-Competence-review-16.04.2024-compressed.pdf, PGNIG-TOMCAT-D-RA-0012-Odfjell-Rig-Intake-Review-Meeting-Report_rev.-2-signed-1.pdf




New Audit Report

You do not have permission to view this form.


\n


Odfjell

No person selected

Report No.

5961
PUN Rig intake review meeting

Type of audit

Rig Intake
Odfjell

Auditee/Customer

Odfjell
PUN

Date

2023/11/10

759 days ago

Findings

20
Number of findings

Status

Closed
Rig Intake


PUN Rig intake review meeting
Summary

As a part of the rig intake and preparations for the Tomcat HPHT exploration well, PGNiG Upstream Norway AS (PUN) performed an onshore review of Odfjell Drilling AS (Odfjell) on both HSE- and technical aspects.
The Review was held at Odfjell’s premises at Kokstadflaten 35 in Bergen.
The review was held in a good atmosphere, the Odfjell participants were very open and willing to explain and share information.
The verification team identified one (1) non-conformity, zero (0) improvement points, zero (0) observations and 23 actions. The findings are listed I Chapter 4.
Odfjell is requested to respond within two weeks of receiving this report on how they intended to handle the findings and sending PUN the required information.
The verification team’s impression is that Odfjell is a rig company that has a well-functioning business management system. Odfjell is ISO 9001, 14001 certified and the management system is prepared according to ISO 45001 and 50014. A separate competence review meeting will be scheduled closer to spud.

Findings

  • Non-Conformity

    Closed


    Closed


    Deadline was:

    IOGP 476 has requirements for level one for roustabouts, crane operators and deck crew. Level 2 requirements for Roughneck, subsea eng. and derrickman.
    Odfjell has a non-conformance from IOGP 476 related to level 1 for crane operator, and deck crew and level 2 for derrickman and roughneck. Although IOGP 476 is a guideline, PSA communicated during previous audits of Wellesley and DNO that this is now a requirement.

    Odfjell to send information how to comply.

    Odfjell have evaluated the requirements and concluded:

    Deck crew and crane operators will take level 1. This is an digital course. dec crew that have drilling education will get a deviation according to IOGP (qualifying examples of work related experience that may lead to considereing dispensation includes – regional vocational training schemes, dvs yrkesrettet utdanning)

    Roughneck and Derrickman are covered by the education VK2 well technique or equivalent drilling course/education.

  • Actions

    Closed


    Closed


    Deadline was:

    A-1: Competence review meeting to be scheduled 1 month before spud.

    20.02.2024 ÅKP: Spud is posponed to september.
    ÅKP. A competence review meeting was held 16.04.2024, se MoM attached

  • Actions

    Closed


    Closed


    Deadline was:

    A-2: A copy of following internal deviations is requested:
    215012
    222822
    228564
    228566
    228568
    228542

    08.12.2023 ÅKP. One requested synergi numer was wrong (228542) It should be 228842. Received

  • Actions

    Closed


    Closed


    Deadline was:

    A-3: Review agenda for Bi-weekly HSE meeting.

    20.02.2024 ÅKP: Ageda will remain, however a more efficient meeting is the new way (30 min).
    Tuesdays at 10:30

  • Actions

    Closed


    Closed


    Deadline was:

    A-4: List of open synergi cases

    Forward list of open synergi cases for DSY

    Open synergi cases are uploaded to dataroom. 27 cases registered and 19 of these were registered as medium risk.

  • Actions

    Closed


    Closed


    Deadline was:

    A-5: Odfjell to forward plan for organisational and
    operational barriers to be visualised

    05.04.24: OD are using manual barrier board and have not got any findings from Havtil on this. They are however looking at several new options to display barriers as a digital solution.

  • Actions

    Closed


    Closed


    Deadline was:

    A-6: New class status report to be sent when
    conditions are closed.

    ÅKP: Class status report 15.01.2024

  • Actions

    Closed


    Closed


    Deadline was:

    A-7: External audit plan (Odfjell’s verification plan
    towards suppliers) to be forwarded.

    Received: 4services, Afrishore and Puglisevich was on the plan in 2023

  • Actions

    Closed


    Closed


    Deadline was:

    A-8: Send information regarding level 1 and 2 course.
    Odfjell to send justification for requirements related to IOGP476.

    Level 1 is a digital course. The Level 1 course has 7 modules which cover the following topics:

    -Overview of Oil and Gas
    -Life Cycle of a Well
    -Drilling Rigs
    -Well Control During Drilling Operations
    -Well Intervention and Workover
    -Pressure Control During Well Intervention
    Conclusion.

    At the end of each module there is a knowledge check which candidate must successfully complete before moving on to the final exam. If a pass mark of 70% or more is achieved in the final exam candidates will be able to access their online certificate.

    Deck, Ass. crane driver will take level 1 course. deck personnel that have drilling course/drilling technical education gets dispensation.
    Roughneck, derrick man is coverd by the fagutdanning VKS2 brønn teknikk or similar accoring to Offshore Norge guideline 024.

  • Actions

    Closed


    Closed


    Deadline was:

    A-9: DROPS survey from Axess to be sent with status on findings. Both report and Synergi to be sent.

    13.11.2023 Received

  • Actions

    Closed


    Closed


    Deadline was:

    A-10: Experience with screen washer from DSN to be communicated.

    Mail from Odfjell 08.12.2023: VI har pr i dag en screenwasher men vi undersøker hvilke modeler som er mest egnet et DSY pga brukervennlighet og best egnet plassering i shaker)
    20.02.2024 ÅKP: Odfjell har ikke offisielt landet på noen avgjørelse om screen washer helt enda, men det kan se ut som om de ikke ønsker å ha dette på DSY pr. nå.

  • Actions

    Closed


    Closed


    Deadline was:

    A-11: Forward HAVS procedure when ready.

    Received: 08.12.2023

  • Actions

    Closed


    Closed


    Deadline was:

    A-12: Update measurement program with Biobar 32
    usage

    Send updated measurement program

    ÅKP 07.02.2024 Received. version 7

  • Actions

    Closed


    Closed


    Deadline was:

    A-13: Forward overview document over all
    equipment and energy consumption

    Received by email 08.12.23

  • Actions

    Closed


    Closed


    Deadline was:

    A-14: Forward all energy saving initiatives planned
    for DSY

    Received by email 08.12.23

  • Actions

    Closed


    Closed


    Deadline was:

    A-15: Prepare L3 procedure for handling of drones within 500m zone. What do one do if the drone lands on the rig?

    Received 08.03.2023. Not a procedure but a presentation of what to do… (Handlingsmønster)

  • Actions

    Closed


    Closed


    Deadline was:

    A-16: Follow-up of maintenance numbers

    03.04.24: New numbers to be reviewed closer to RTO.
    04.11.2024 ÅKP. Status:
    Overdue corrective work orders (CWO) that are safety critical elements (SCE): 1 (0)
    Overdue planned work orders that are SCE: 0 (26) (low and medium priority WOs)
    Open CWO that are SCE: 173 (33)
    Open planned WO that are SCE: 125 (382)
    Open CWO that are not SCE: 72 (202)
    Total open planned WO that are not SCE: 551 (4915)

  • Actions

    Closed


    Closed


    Deadline was:

    A-17: Send updated helideck certificate

    Received 19.02.2024

  • Actions

    Closed


    Closed


    Deadline was:

    A-18: Odfjell to inform RIT on timing for startup of
    maintenance on diesel generators in due time.

    05.04.24: Current plan is to do this work in November. Need to inform PGNiG to avoid interrupting any work.
    18.12.24 One taken during SPS. Next is during May/June. An will not effect Tomcat or Kjøttkake.

  • Actions

    Closed


    Closed


    Deadline was:

    A-19: Findings from the Cranes and lifting verification to be followed up.

    03.04.24: This is being followed. Please refer to 6009 Vår Lifting Verification.



Additional Documentation


PGNIG-TOMC-D-RA-0012-Odfjell-Rig-Intake-Review-Meeting-Report-26th-of-September.pdf, 215012.pdf, 222822.pdf, 228564.pdf, 228566.pdf, 228568.pdf, 234592-NC-1-IOGP-476.pdf, 234594.pdf, OD-Handlingsmonster-ved-droneaktivitet-1.pptx, EXPOSURE-TO-NOISE-AND-VIBRATION-FROM-HAND-HELD-TOOLS.pdf, 258034-16-278-01-Picture-log-Findings-DROPS-inspection.pdf, 258034-16-272-01-Field-Service-Report.pdf, Deepsea-Yantai-Certificate-2023.pdf, MOM-Competence-review-16.04.2024-compressed.pdf, PGNIG-TOMCAT-D-RA-0012-Odfjell-Rig-Intake-Review-Meeting-Report_rev.-2-signed-1.pdf



\n”}}]}]}]},{“type”:”section”,”props”:{“class”:”uk-hidden”,”id”:”newreport”,”image_position”:”center-center”,”padding”:”none”,”style”:”default”,”title_breakpoint”:”xl”,”title_position”:”top-left”,”title_rotation”:”left”,”vertical_align”:””,”width”:”default”},”children”:[{“type”:”row”,”children”:[{“type”:”column”,”props”:{“image_position”:”center-center”,”position_sticky_breakpoint”:”m”},”children”:[{“type”:”html”,”props”:{“content”:”

\n

\n

New Audit Report