Findings

23
Number of findings

Status

In process
Rig Intake


DSY Offshore Verification
Summary

An offshore verification has been carried out on Deepsea Yantai during the period 28th September – 2nd
October 2023.

Objective to perform an offshore inspection with spot‐checks from listed verification and audit activities,
verification of routines for experience transfer, inspection of lifting operations and equipment. In addition to
perform a general walk‐around on the rig.

In total 29 findings , 6 of these were non-conformances and 23 observations.

The main impression from the inspection onboard is good, both regarding crew and their competency as well
as the technical condition. However, some major observations (deviation) were made:
1. Working Environment. The EMF survey was not known to the crew we asked (safety and stab leader).
This should be communicated from onshore team. This deviation was identified during verifications in
2022 and should be completed and any actions followed‐up and implemented.
2. Ignition Source Control. Non ex portable equipment stored in crane cabin. Does not shut down in an ESD
situation. The management had focus on this, and it was mentioned in the weekly safety meeting that
portable non ex equipment, like laptops and watches etc., shall not be taken outside controlled areas
without a hot work permit.
3. Fire Protection. It is not described in IFS that DSY should leak test the isolation valves on the fire water
line. They have routines for moving the valves, and training for locating the valves. There should be a
routine to isolate of a section of the line, and bleed of the pressure on a hydrant, to verify that the
isolation valves are actually holding the pressure when in closed position.
4. Passive Fire Protection. Fire door from male changing room out to the corridor is in poor condition, and
not closing automatically. Generally, the condition of fire doors is ok on DSY, but it important to keep
routines for inspection/repair/replacements.
5. Electrical Systems and Installations. The arc flash signs on switchboards are not in accordance with
regulations. It does not clarify what level of PPE that is required to work on the specific switchboard. We
were informed that Siemens are working on an updated study on arc flash, which include modifications
to lower required PPE level from level 3 to work on some of the MCCs.
6. Material Handling ‐ Deck Cranes. Odfjell should come up with a routine that either finds a fully
replacement for the crane log book, or they should start using the log book as intended on a daily basis.
The logbook is now used only by a few crane operators, and only sporadically. There is separate checklist
for daily routines that are followed up, and there are weekly routines for technical maintenance that are
followed up on a separate sheet. However, the regulation requires to keep and log book updated, and
DSY fails on the following currently;
The logbook should contain information to the incoming lifting appliance operator or shift about
conditions that can influence the further operation of the lifting appliance.

Findings

  • Observation

    Closed


    Closed


    Deadline was:

    1.1 It was observed that chemical lockers outside accommodation had chemicals not in the inventory list stored inside.

    We recommend that Odfjell reviews all chemicals lockers to make sure that the inventory is correct.

    Synergi 234075 – 02.11.223 KWIR DSY Medic has produced new inventory lists to all chemical lockers and they’ve been distributed. All have been instructed to assess content in locker and remove what’s not ion the index list.

  • Observation

    Closed


    Closed


    Deadline was:

    1.2 We recommend having a smaller chemical locker in the welders shop, as the “floor to roof” locker that is installed there now, is used to store other material.

    We recommend having a smaller chemical locker in the welders shop, as the “floor to roof” locker that is installed there now, is used to store other material.

    Synergi 234075 – 11.11.23 RBR Evaluated current solution and found that we would like to keep the current arrangement. The chemicals are on a dedicated shelf and the cabinet is ventilated.

  • Observation

    Closed


    Closed


    Deadline was:

    2.1. There was 124 overdue PMs. 1 safety critical overdue. The safety critical was for
    test of BOP control system. Due to the activities on the BOP this was postponed.
    It is recommended to distribute the 12M PMs that is due in October and November (late Oct and early Nov in particular) over the summer/ late autumn.
    The upcoming 5 yearly SPS should be a good time to do this.

    It is recommended to distribute the 12M PMs that is due in October and November (late Oct and early Nov in particular) over the summer/ late autumn. The upcoming 5 yearly SPS should be a good time to do this.

    Synergi 234075. 10.11.23 ANKJ we are currently working with Technical services to spread out the PM over the year to avoid the November Peak

  • Non-Conformity

    Closed


    Closed


    Deadline was:

    5.1 The EMF survey was not known to the crew we asked (safety and stab leader). This should be communicated from onshore team. This deviation was identified during verifications in 2022 and should be completed and any actions followed up
    and implemented. Odfjell to action.

    EMF survey to be carried out and any actions followed up and implemented. Odfjell to action.

    Synergi 234075. 10.11.23 ANKJ The survey will be conducted and PO is sent ref PO 306878 EMF consult. This is informed i AMU and in the weekly Maintenance meeting

  • Observation

    Closed


    Closed


    Deadline was:

    8.1 and it is evident that the system is used regularly.
    The verification team is of the opinion that the technical barrier overview could
    (and should) be in an electronic interface (e.g. Power BI), and it should be
    possible to collect all necessary data in an easy to view interface. As the system is now, the OIM uses several programs and a barrier‐blackboard situated in the control room, to have the complete overview of the vessels barriers.

    Physical barriers are monitored in CCR on a “Barrier Management Board”. The board shall give an overview of the defected/impaired barriers of Technical Barriers (Safety Environmental Critical Elements). Organisational and Operational barriers are monitored through self-through self-verifications, audits and verifications and competence assurance.

  • Non-Conformity

    Closed


    Closed


    Deadline was:

    13.1 Non ex portable equipment stored in crane cabin. Does not shut down in an ESD
    situation. The management had focus on this, and it was mentioned in the weekly
    safety meeting that portable non ex equipment, like laptops and watches etc.,
    shall not be taken outside controlled areas without a hot work permit.

    Odfjell to implement corrective actions.

    Synergi 234075. 13.11.23 JKAA: Non ex equipment in crane cabins moved for storage in suitable area. (the equipment itself is still in the cabin but the battery including charger is removed and equipment is marked with instructions of how to handle within requirements

  • Observation

    In Process

    In Process


    Deadline was:

    13.2 There are several doors, in potentially hazardous areas (like shaker room and moonpool) with signs saying, “Portable electrical equipment supplied by flexible cables shall not be used in areas there is gas danger!”.
    It is confusing to the inspection team, what the purpose of these signs are. A hot work permit is required to bring such equipment into these areas anyway, and if anything, these signs can be interpreted to mean that you have to use portable equipment without flexible cables for supply (like a vacuum cleaner on battery). DSY to investigated and explain why these signs are there – and highly consider to remove them.

  • Non-Conformity

    Closed


    Closed


    Deadline was:

    15.1 It is not described in IFS that DSY should leak test the isolation valves on the fire
    water line. They have routines for moving the valves, and training for locating the valves. There should be a routine to isolate of a section of the line, and bleed of
    the pressure on a hydrant, to verify that the isolation valves are actually holding the pressure when in closed position.

    There should be a routine to isolate of a section of the line, and bleed of the pressure on a hydrant, to verify that the isolation valves are actually holding the pressure when in closed position.

    Synergi 234075. There should be a routine to isolate of a section of the line, and bleed of the pressure on a hydrant, to verify that the isolation valves are actually holding the pressure when in closed position.

  • Observation

    Closed


    Closed


    Deadline was:

    15.2. The verification team discovered that there is a few fire cabinet (for storing hoses
    and couplings) that are in poor condition. They should be considered changed out. The one in the picture log was the worst we found and is located on the top
    of the stairs from the forward staircase to the sack store roof.

    They should be considered changed out. The one in the picture log was the worst we found and is located on the top of the stairs from the forward staircase to the sack store roof.

    Synergi 234075. 10.11.23 ANKJ – Please collect a quote for new stainless steel cabinets (contact shore org for TIR) before purchase

  • Observation

    Closed


    Closed


    Deadline was:

    16.1. MCTs as part of passive fire protection (and watertight integrity); there is tagging
    on most of the MCTs, but it is not carried out on all of them. DSY to ensure that
    they have control of the condition of the MCTs. This should include the MCTs in
    the cranes.

    DSY to ensure that they have control of the condition of the MCTs. This should include the MCTs in the cranes.

    Synergi 234075. 10.11.23 ANKJ Roxtec is conducting a complete survey for MCT and recorded in Inspectio ( same we use for EX inspections ) They started the mapping on board 10.11.23 and will take aprox 4 weeks to complete

  • Non-Conformity

    Closed


    Closed


    Deadline was:

    16.2. Fire door from male changing room out to the corridor is in poor condition, and not closing automatically. Generally, the condition of fire doors is ok on DSY, but it important to keep routines for inspection/repair/replacements.

    Review routines for inspection, repair and replacement.

    Synergi 234075. RBR 04/11-23 Created WO:26007601 for repair RBR 06/11-23 Door repaired and working as should

  • Observation

    Closed


    Closed


    Deadline was:

    18.1. There are several battery lights installed in heights, that do not have a security
    strip around the battery enclosure. We were told by the electrician that the outside strip is not necessary since there is double securing inside the enclosure.
    Odfjell to verify it’s policy towards these types of battery packages.

    Odfjell to verify it’s policy towards these types of battery packages.

    Synergi 234075. 0.11.23 ANKJ Flyttet til E&I Land.
    22.11.23 HABJ: The Glamox lighting fixtures with batteries are of design made with two barriers. Primary barrier is the fixture/battery clip, and secondary barrier is the screw securing the battery to the battery holder. In addition, Glamox offers a third independent securing mechanism by means of a steel plate and internal wire within the battery pack. The fixtures mentioned onboard DSY has included the independent securing mechanism and a spot check of several fixtures was carried out by the electrician onboard on Monday 20th of November where this was also proven. Odfjell Drilling has agreement with Glamox that delivery of new lighting fixtures with batteries are also delivered with the independent securing mechanism.
    24.11.23 RS: Agreed to be closed in meeting.

  • Non-Conformity

    In Process

    In Process


    Deadline was:

    21.1. The arc flash signs on switchboards are not in accordance with regulations. It
    does not clarify what level of PPE that is required to work on the specific switchboard. We were informed that Siemens are working on an updated study
    on arc flash, which include modifications to lower required PPE level from level 3
    to work on some of the MCCs.

  • Observation

    Closed


    Closed


    Deadline was:

    29.1. Odfjell to provide information of routines for experience transfer in general, and for this incident specific.

    Odfjell to provide information of routines for experience transfer in general, and for this incident specific.

    Synergi 234075. 24.11.23 ANKJ We have good routines for sharing experience in Odfjell. Agreed to close this action in meeting the 24.11.23.

  • Non-Conformity

    Closed


    Closed


    Deadline was:

    30.1. Odfjell should come up with a routine that either finds a fully replacement for the
    crane log book, or they should start using the log book as intended on a daily basis. The logbook is now used only by a few crane operators, and only
    sporadically. There is separate checklist for daily routines that are followed up, and there are weekly routines for technical maintenance that are followed up on
    a separate sheet. However, the regulation requires to keep and log book
    updated, and DSY fails on the following currently;
    The logbook should contain information to the incoming lifting appliance operator or shift about conditions that can influence the further operation of the lifting appliance.

    The logbook should contain information to the incoming lifting appliance operator or shift about conditions that can influence the further operation of the lifting appliance.

    Synergi 234075.12.11.23 ROSV: Crane logbooks marked with requirement according to procedure. This synergi and the procedure requirement also put into TM experience transfer folder for review and signing by all deck crews.
    24.11.23: Agreed to be closed in meeting.

  • Observation

    Closed


    Closed


    Deadline was:

    30.2. Lifting beams and pad eyes on the cranes. The inspection team is of the
    understanding that the beams on the a‐frame and outside the machinery space +
    the pad eye on the lower part of the a‐frame, are not in the 3rd party’s scope for
    yearly inspection. We could not find evident of inspection in the report from
    Axess, or on the equipment itself (no green tag or strip). Odfjell to ensure that
    this equipment is certified for further use before using it.

    Odfjell to ensure that this equipment is certified for further use before using it.

    Synergi 234075. 17.11.23 JKAA: Initial certificate in bridge/axess for deck cranes includes swing beams and padeyes. With reference to Norsok R-003, Chapter 8.3 these are not subject to yearly inspection. Pre and post use check is satisfactory in addition to control and verification in case of suspicion of structural fatigue.
    24.11.23: Agreed to be closed in meeting.

  • Observation

    In Process

    In Process


    Deadline was:

    30.3. The hatch for entering the slew ring does not have a proper way of holding it in open position when personnel enter.

  • Observation

    Closed


    Closed


    Deadline was:

    30.4. The wind socket on port side, has silver tape around fastening points. This makes
    it very hard to discover if there are breakdowns that could potentially cause a
    dropped object. The one on the starboard side has a very corroded shackle for the wire that is used to bring the socket in for inspection/replacement. This
    should be replaced with a shackle suitable for the environment it is in.

    This should be replaced with a shackle suitable for the environment it is in.

    Synergi 234075. 15.11.23 JKAA: Corroded shackle replaced with new both starboard and port side. The tape is only for protection at the end of the wire and condition of the wire is evaluated during periodic drops check.
    24.11.23: Agreed to be closed in meeting.

  • Observation

    Closed


    Closed


    30.5. The sheaves on the boom tip, both port and starboard side, is corroded. Should
    be considered replaced. There is some surface corrosion starting to pop up on the
    cranes, and DSY should consider some spot surface treatment.

    DSY should consider some spot surface treatment.

    Synergi 234075. 12.11.23 ROSV: Corrosion to be monitored during inspection routines in IFS maintenance system. The corrosion at this stage is within acceptable grade. NOV condition assessment of the cranes did not identify this as a finding during recent inspection. Spot surface treatment followed up in paint plan document.

  • Observation

    Closed


    Closed


    Deadline was:

    32.1. It is recommended to color code the winches on location (at fingerboard level)
    the same color as the remote control is colored. This to avoid confusion if
    required to emergency operate the winches. It is not obvious which winch is
    which. The numbering is only available on the certificate, which is located at the
    side/bottom of the winch. Not easy to see at all.

    Odfjell to review and take appropriate action.

    Synergi 234075. 29.10.2023 VEOE. Utility winches in derrick has been marked with information signs for colour and number. Picture attached to tiltak

  • Observation

    Closed


    Closed


    Deadline was:

    32.2. DSY should ensure that the wire for utility winch 1 and 2 (starboard winches) are not damaged. The current location for parked position, makes the wire rest towards a derrick beam, potentially damaging the wires in a position where it is not normally inspected.

    Odfjell to review and take appropriate action.

    Synergi 234075. 12.11.23 ROSV: Condition of the wire monitored during IFS maintenance routines. Not considered a risk of rapidly escalating damage as setup is today. Moving the parking position will introduce further hazards with collision of equipment. Protection of the beam will introduce new hazards with respect to DROPS. Evaluated by offshore management that to keep it as it is now is the best solution

  • Observation

    In Process

    In Process


    Deadline was:

    32.3. DSY to ensure that lifting equipment are included in the yearly certification
    process according to regulations. Outside the beams on the crane, which is
    mentioned above, we found that the lifting beams on the yellow and blue pod
    winch (0,11T) and the one on the escape chutes are not on the Axess report (at
    least we could not find it there). Further, they are not marked with anything that can identify that they have been inspected. There is also some equipment that
    are not allowed to use due to missing certificate. This should be sorted.

    Odfjell to review and take appropriate action.

    Syenrgi 234075.

  • Observation

    Closed


    Closed


    Deadline was:

    32.4. During our inspection in the derrick, we found 3 leavers (small leavers for
    operating hydraulic valves) that didn’t have double securing against dropping.
    This was communicated to the rig and assumed handled. DSY to ensure that their standards for double securing of equipment in height are meet. The one

    Odfjell to review and take appropriate action.

    Synergi 234075. 31.10.2023 VEOE. Findings from this report regards leavers on utility winch number # 3 and bellyboard are both fixed. We have regularly IFS maintenance jobs for DROPS check and weekly HMS check in derrick. Performed extra inspection for checking double securing.



Additional Documentation

RP-112-23-3-Offshore-inspection-Deepsea-Yantai_Rev02-Final.pdf


RP-112-23-3-Offshore-inspection-Deepsea-Yantai_Rev02-Final.pdf




New Audit Report

You do not have permission to view this form.


\n


Odfjell

No person selected

Report No.

6032
DSY Offshore Verification

Type of audit

Rig Intake
Odfjell

Auditee/Customer

Odfjell
Vår Energi

Date

2023/12/07

731 days ago

Findings

23
Number of findings

Status

In process
Rig Intake


DSY Offshore Verification
Summary

An offshore verification has been carried out on Deepsea Yantai during the period 28th September – 2nd
October 2023.

Objective to perform an offshore inspection with spot‐checks from listed verification and audit activities,
verification of routines for experience transfer, inspection of lifting operations and equipment. In addition to
perform a general walk‐around on the rig.

In total 29 findings , 6 of these were non-conformances and 23 observations.

The main impression from the inspection onboard is good, both regarding crew and their competency as well
as the technical condition. However, some major observations (deviation) were made:
1. Working Environment. The EMF survey was not known to the crew we asked (safety and stab leader).
This should be communicated from onshore team. This deviation was identified during verifications in
2022 and should be completed and any actions followed‐up and implemented.
2. Ignition Source Control. Non ex portable equipment stored in crane cabin. Does not shut down in an ESD
situation. The management had focus on this, and it was mentioned in the weekly safety meeting that
portable non ex equipment, like laptops and watches etc., shall not be taken outside controlled areas
without a hot work permit.
3. Fire Protection. It is not described in IFS that DSY should leak test the isolation valves on the fire water
line. They have routines for moving the valves, and training for locating the valves. There should be a
routine to isolate of a section of the line, and bleed of the pressure on a hydrant, to verify that the
isolation valves are actually holding the pressure when in closed position.
4. Passive Fire Protection. Fire door from male changing room out to the corridor is in poor condition, and
not closing automatically. Generally, the condition of fire doors is ok on DSY, but it important to keep
routines for inspection/repair/replacements.
5. Electrical Systems and Installations. The arc flash signs on switchboards are not in accordance with
regulations. It does not clarify what level of PPE that is required to work on the specific switchboard. We
were informed that Siemens are working on an updated study on arc flash, which include modifications
to lower required PPE level from level 3 to work on some of the MCCs.
6. Material Handling ‐ Deck Cranes. Odfjell should come up with a routine that either finds a fully
replacement for the crane log book, or they should start using the log book as intended on a daily basis.
The logbook is now used only by a few crane operators, and only sporadically. There is separate checklist
for daily routines that are followed up, and there are weekly routines for technical maintenance that are
followed up on a separate sheet. However, the regulation requires to keep and log book updated, and
DSY fails on the following currently;
The logbook should contain information to the incoming lifting appliance operator or shift about
conditions that can influence the further operation of the lifting appliance.

Findings

  • Observation

    Closed


    Closed


    Deadline was:

    1.1 It was observed that chemical lockers outside accommodation had chemicals not in the inventory list stored inside.

    We recommend that Odfjell reviews all chemicals lockers to make sure that the inventory is correct.

    Synergi 234075 – 02.11.223 KWIR DSY Medic has produced new inventory lists to all chemical lockers and they’ve been distributed. All have been instructed to assess content in locker and remove what’s not ion the index list.

  • Observation

    Closed


    Closed


    Deadline was:

    1.2 We recommend having a smaller chemical locker in the welders shop, as the “floor to roof” locker that is installed there now, is used to store other material.

    We recommend having a smaller chemical locker in the welders shop, as the “floor to roof” locker that is installed there now, is used to store other material.

    Synergi 234075 – 11.11.23 RBR Evaluated current solution and found that we would like to keep the current arrangement. The chemicals are on a dedicated shelf and the cabinet is ventilated.

  • Observation

    Closed


    Closed


    Deadline was:

    2.1. There was 124 overdue PMs. 1 safety critical overdue. The safety critical was for
    test of BOP control system. Due to the activities on the BOP this was postponed.
    It is recommended to distribute the 12M PMs that is due in October and November (late Oct and early Nov in particular) over the summer/ late autumn.
    The upcoming 5 yearly SPS should be a good time to do this.

    It is recommended to distribute the 12M PMs that is due in October and November (late Oct and early Nov in particular) over the summer/ late autumn. The upcoming 5 yearly SPS should be a good time to do this.

    Synergi 234075. 10.11.23 ANKJ we are currently working with Technical services to spread out the PM over the year to avoid the November Peak

  • Non-Conformity

    Closed


    Closed


    Deadline was:

    5.1 The EMF survey was not known to the crew we asked (safety and stab leader). This should be communicated from onshore team. This deviation was identified during verifications in 2022 and should be completed and any actions followed up
    and implemented. Odfjell to action.

    EMF survey to be carried out and any actions followed up and implemented. Odfjell to action.

    Synergi 234075. 10.11.23 ANKJ The survey will be conducted and PO is sent ref PO 306878 EMF consult. This is informed i AMU and in the weekly Maintenance meeting

  • Observation

    Closed


    Closed


    Deadline was:

    8.1 and it is evident that the system is used regularly.
    The verification team is of the opinion that the technical barrier overview could
    (and should) be in an electronic interface (e.g. Power BI), and it should be
    possible to collect all necessary data in an easy to view interface. As the system is now, the OIM uses several programs and a barrier‐blackboard situated in the control room, to have the complete overview of the vessels barriers.

    Physical barriers are monitored in CCR on a “Barrier Management Board”. The board shall give an overview of the defected/impaired barriers of Technical Barriers (Safety Environmental Critical Elements). Organisational and Operational barriers are monitored through self-through self-verifications, audits and verifications and competence assurance.

  • Non-Conformity

    Closed


    Closed


    Deadline was:

    13.1 Non ex portable equipment stored in crane cabin. Does not shut down in an ESD
    situation. The management had focus on this, and it was mentioned in the weekly
    safety meeting that portable non ex equipment, like laptops and watches etc.,
    shall not be taken outside controlled areas without a hot work permit.

    Odfjell to implement corrective actions.

    Synergi 234075. 13.11.23 JKAA: Non ex equipment in crane cabins moved for storage in suitable area. (the equipment itself is still in the cabin but the battery including charger is removed and equipment is marked with instructions of how to handle within requirements

  • Observation

    In Process

    In Process


    Deadline was:

    13.2 There are several doors, in potentially hazardous areas (like shaker room and moonpool) with signs saying, “Portable electrical equipment supplied by flexible cables shall not be used in areas there is gas danger!”.
    It is confusing to the inspection team, what the purpose of these signs are. A hot work permit is required to bring such equipment into these areas anyway, and if anything, these signs can be interpreted to mean that you have to use portable equipment without flexible cables for supply (like a vacuum cleaner on battery). DSY to investigated and explain why these signs are there – and highly consider to remove them.

  • Non-Conformity

    Closed


    Closed


    Deadline was:

    15.1 It is not described in IFS that DSY should leak test the isolation valves on the fire
    water line. They have routines for moving the valves, and training for locating the valves. There should be a routine to isolate of a section of the line, and bleed of
    the pressure on a hydrant, to verify that the isolation valves are actually holding the pressure when in closed position.

    There should be a routine to isolate of a section of the line, and bleed of the pressure on a hydrant, to verify that the isolation valves are actually holding the pressure when in closed position.

    Synergi 234075. There should be a routine to isolate of a section of the line, and bleed of the pressure on a hydrant, to verify that the isolation valves are actually holding the pressure when in closed position.

  • Observation

    Closed


    Closed


    Deadline was:

    15.2. The verification team discovered that there is a few fire cabinet (for storing hoses
    and couplings) that are in poor condition. They should be considered changed out. The one in the picture log was the worst we found and is located on the top
    of the stairs from the forward staircase to the sack store roof.

    They should be considered changed out. The one in the picture log was the worst we found and is located on the top of the stairs from the forward staircase to the sack store roof.

    Synergi 234075. 10.11.23 ANKJ – Please collect a quote for new stainless steel cabinets (contact shore org for TIR) before purchase

  • Observation

    Closed


    Closed


    Deadline was:

    16.1. MCTs as part of passive fire protection (and watertight integrity); there is tagging
    on most of the MCTs, but it is not carried out on all of them. DSY to ensure that
    they have control of the condition of the MCTs. This should include the MCTs in
    the cranes.

    DSY to ensure that they have control of the condition of the MCTs. This should include the MCTs in the cranes.

    Synergi 234075. 10.11.23 ANKJ Roxtec is conducting a complete survey for MCT and recorded in Inspectio ( same we use for EX inspections ) They started the mapping on board 10.11.23 and will take aprox 4 weeks to complete

  • Non-Conformity

    Closed


    Closed


    Deadline was:

    16.2. Fire door from male changing room out to the corridor is in poor condition, and not closing automatically. Generally, the condition of fire doors is ok on DSY, but it important to keep routines for inspection/repair/replacements.

    Review routines for inspection, repair and replacement.

    Synergi 234075. RBR 04/11-23 Created WO:26007601 for repair RBR 06/11-23 Door repaired and working as should

  • Observation

    Closed


    Closed


    Deadline was:

    18.1. There are several battery lights installed in heights, that do not have a security
    strip around the battery enclosure. We were told by the electrician that the outside strip is not necessary since there is double securing inside the enclosure.
    Odfjell to verify it’s policy towards these types of battery packages.

    Odfjell to verify it’s policy towards these types of battery packages.

    Synergi 234075. 0.11.23 ANKJ Flyttet til E&I Land.
    22.11.23 HABJ: The Glamox lighting fixtures with batteries are of design made with two barriers. Primary barrier is the fixture/battery clip, and secondary barrier is the screw securing the battery to the battery holder. In addition, Glamox offers a third independent securing mechanism by means of a steel plate and internal wire within the battery pack. The fixtures mentioned onboard DSY has included the independent securing mechanism and a spot check of several fixtures was carried out by the electrician onboard on Monday 20th of November where this was also proven. Odfjell Drilling has agreement with Glamox that delivery of new lighting fixtures with batteries are also delivered with the independent securing mechanism.
    24.11.23 RS: Agreed to be closed in meeting.

  • Non-Conformity

    In Process

    In Process


    Deadline was:

    21.1. The arc flash signs on switchboards are not in accordance with regulations. It
    does not clarify what level of PPE that is required to work on the specific switchboard. We were informed that Siemens are working on an updated study
    on arc flash, which include modifications to lower required PPE level from level 3
    to work on some of the MCCs.

  • Observation

    Closed


    Closed


    Deadline was:

    29.1. Odfjell to provide information of routines for experience transfer in general, and for this incident specific.

    Odfjell to provide information of routines for experience transfer in general, and for this incident specific.

    Synergi 234075. 24.11.23 ANKJ We have good routines for sharing experience in Odfjell. Agreed to close this action in meeting the 24.11.23.

  • Non-Conformity

    Closed


    Closed


    Deadline was:

    30.1. Odfjell should come up with a routine that either finds a fully replacement for the
    crane log book, or they should start using the log book as intended on a daily basis. The logbook is now used only by a few crane operators, and only
    sporadically. There is separate checklist for daily routines that are followed up, and there are weekly routines for technical maintenance that are followed up on
    a separate sheet. However, the regulation requires to keep and log book
    updated, and DSY fails on the following currently;
    The logbook should contain information to the incoming lifting appliance operator or shift about conditions that can influence the further operation of the lifting appliance.

    The logbook should contain information to the incoming lifting appliance operator or shift about conditions that can influence the further operation of the lifting appliance.

    Synergi 234075.12.11.23 ROSV: Crane logbooks marked with requirement according to procedure. This synergi and the procedure requirement also put into TM experience transfer folder for review and signing by all deck crews.
    24.11.23: Agreed to be closed in meeting.

  • Observation

    Closed


    Closed


    Deadline was:

    30.2. Lifting beams and pad eyes on the cranes. The inspection team is of the
    understanding that the beams on the a‐frame and outside the machinery space +
    the pad eye on the lower part of the a‐frame, are not in the 3rd party’s scope for
    yearly inspection. We could not find evident of inspection in the report from
    Axess, or on the equipment itself (no green tag or strip). Odfjell to ensure that
    this equipment is certified for further use before using it.

    Odfjell to ensure that this equipment is certified for further use before using it.

    Synergi 234075. 17.11.23 JKAA: Initial certificate in bridge/axess for deck cranes includes swing beams and padeyes. With reference to Norsok R-003, Chapter 8.3 these are not subject to yearly inspection. Pre and post use check is satisfactory in addition to control and verification in case of suspicion of structural fatigue.
    24.11.23: Agreed to be closed in meeting.

  • Observation

    In Process

    In Process


    Deadline was:

    30.3. The hatch for entering the slew ring does not have a proper way of holding it in open position when personnel enter.

  • Observation

    Closed


    Closed


    Deadline was:

    30.4. The wind socket on port side, has silver tape around fastening points. This makes
    it very hard to discover if there are breakdowns that could potentially cause a
    dropped object. The one on the starboard side has a very corroded shackle for the wire that is used to bring the socket in for inspection/replacement. This
    should be replaced with a shackle suitable for the environment it is in.

    This should be replaced with a shackle suitable for the environment it is in.

    Synergi 234075. 15.11.23 JKAA: Corroded shackle replaced with new both starboard and port side. The tape is only for protection at the end of the wire and condition of the wire is evaluated during periodic drops check.
    24.11.23: Agreed to be closed in meeting.

  • Observation

    Closed


    Closed


    30.5. The sheaves on the boom tip, both port and starboard side, is corroded. Should
    be considered replaced. There is some surface corrosion starting to pop up on the
    cranes, and DSY should consider some spot surface treatment.

    DSY should consider some spot surface treatment.

    Synergi 234075. 12.11.23 ROSV: Corrosion to be monitored during inspection routines in IFS maintenance system. The corrosion at this stage is within acceptable grade. NOV condition assessment of the cranes did not identify this as a finding during recent inspection. Spot surface treatment followed up in paint plan document.

  • Observation

    Closed


    Closed


    Deadline was:

    32.1. It is recommended to color code the winches on location (at fingerboard level)
    the same color as the remote control is colored. This to avoid confusion if
    required to emergency operate the winches. It is not obvious which winch is
    which. The numbering is only available on the certificate, which is located at the
    side/bottom of the winch. Not easy to see at all.

    Odfjell to review and take appropriate action.

    Synergi 234075. 29.10.2023 VEOE. Utility winches in derrick has been marked with information signs for colour and number. Picture attached to tiltak

  • Observation

    Closed


    Closed


    Deadline was:

    32.2. DSY should ensure that the wire for utility winch 1 and 2 (starboard winches) are not damaged. The current location for parked position, makes the wire rest towards a derrick beam, potentially damaging the wires in a position where it is not normally inspected.

    Odfjell to review and take appropriate action.

    Synergi 234075. 12.11.23 ROSV: Condition of the wire monitored during IFS maintenance routines. Not considered a risk of rapidly escalating damage as setup is today. Moving the parking position will introduce further hazards with collision of equipment. Protection of the beam will introduce new hazards with respect to DROPS. Evaluated by offshore management that to keep it as it is now is the best solution

  • Observation

    In Process

    In Process


    Deadline was:

    32.3. DSY to ensure that lifting equipment are included in the yearly certification
    process according to regulations. Outside the beams on the crane, which is
    mentioned above, we found that the lifting beams on the yellow and blue pod
    winch (0,11T) and the one on the escape chutes are not on the Axess report (at
    least we could not find it there). Further, they are not marked with anything that can identify that they have been inspected. There is also some equipment that
    are not allowed to use due to missing certificate. This should be sorted.

    Odfjell to review and take appropriate action.

    Syenrgi 234075.

  • Observation

    Closed


    Closed


    Deadline was:

    32.4. During our inspection in the derrick, we found 3 leavers (small leavers for
    operating hydraulic valves) that didn’t have double securing against dropping.
    This was communicated to the rig and assumed handled. DSY to ensure that their standards for double securing of equipment in height are meet. The one

    Odfjell to review and take appropriate action.

    Synergi 234075. 31.10.2023 VEOE. Findings from this report regards leavers on utility winch number # 3 and bellyboard are both fixed. We have regularly IFS maintenance jobs for DROPS check and weekly HMS check in derrick. Performed extra inspection for checking double securing.



Additional Documentation

RP-112-23-3-Offshore-inspection-Deepsea-Yantai_Rev02-Final.pdf


RP-112-23-3-Offshore-inspection-Deepsea-Yantai_Rev02-Final.pdf



\n”}}]}]}]},{“type”:”section”,”props”:{“class”:”uk-hidden”,”id”:”newreport”,”image_position”:”center-center”,”padding”:”none”,”style”:”default”,”title_breakpoint”:”xl”,”title_position”:”top-left”,”title_rotation”:”left”,”vertical_align”:””,”width”:”default”},”children”:[{“type”:”row”,”children”:[{“type”:”column”,”props”:{“image_position”:”center-center”,”position_sticky_breakpoint”:”m”},”children”:[{“type”:”html”,”props”:{“content”:”

\n

\n

New Audit Report