WE Report

Audits



COSL Drilling Europe AS

No person selected

Report No.

6222
COSLPromoter – Rig Inspection Report

Type of audit

Rig Intake
COSL Drilling Europe AS

Auditee/Customer

COSL Drilling Europe AS
Wellesley

Date

2024/03/21

627 days ago

Findings

17
Number of findings

Status

Registered
Rig Intake


COSLPromoter – Rig Inspection Report
Summary

The Rig Intake Team (RIT) would like to acknowledge the support provided by all CDE, Equinor and
service personnel during the verification. All persons involved from each company were open,
extremely helpful and positive.
The rig was on location on the 33/9-F-4 BH well performing BOP testing and wellhead cleanup
operations during 21/03/2024 prior to running upper completion. On the evening 21/03/2024 the rig
disconnected the LMRP from the BOP due to weather and started WOW.
The overall impression of the RIT is that the rig is effectively managed by CDE, rig equipment is in
uniformly good condition and housekeeping is maintained at a very high standard. A common
unprompted theme while talking to all personnel, whether service, CDE or Operator was the positive
culture on the rig. A positive culture starts with positive leadership. This culture is one that both the
current operator Equinor, the CDE rig management and all individuals on board should be justly
proud of.
The RIT identified 17 findings: 0 non-conformances, 6 observations and 11 improvement
suggestions. The findings are described in Chapter 4 and summed up in an action list for follow up
in chapter 5.1. None of the findings are considered critical for the upcoming operations.

Findings

  • Observation

    Closed


    Closed


    Deadline was:

    O-1 Paint locker
    Paint locker housekeeping poor

    Tidy up paint locker and remove used cans and
    rags

    ÅKP. Info from CDE: 26.03.24 PMH This has been tidied up

  • Observation

    Closed


    Closed


    Deadline was:

    O-2 Poorly stored clip-top drums
    Clip top drums stored near waste handling
    station without being secured. Unclear whether
    empty or filled with waste.

    Confirm contents of drums and sea fasten same

    ÅKP. Infor from CDE. 26.03.24 PMH We have made signs and secured them.

  • Observation

    Closed


    Closed


    Deadline was:

    O-3 Housekeeping in Welder’s Shop
    Cardboard boxes (flammable material) stored in
    shop. Best stored elsewhere.

    Clear cardboard and dispose of same or store
    elsewhere

    ÅKP. Info from CDE is that it is closed. no text in the synergi.

  • Observation

    Closed


    Closed


    Deadline was:

    O-4 Housekeeping in Crane machinery room
    Poor housekeeping of various cleaning equipment

    Tidy up area

    ÅKP. Info from CDE: 26.03.24 PMH This has been cleaned up.

  • Observation

    Closed


    Closed


    Deadline was:

    O-5 ONIX system “snapshot” of certified equipment on
    rig.

    Inaccuracy of ONIX system in giving “snapshot”
    of certified equipment on rig

    Investigate with ONIX ways of improving accuracy
    eg identifying items shipped off the rig. Improve
    systems for recording serial numbers of
    condemned equipment so that they are removed
    from the database. AXESS staff may be able to
    assist with this.

    ÅKP. Infor from CDE: 26.03.24 PMH We will emphasize this to axess so they can assist us in removing old items, we will also see if its possible to get a solution from onix to manage sent equipment.

  • Observation

    Open

    Open
    Deadline was:

    O-6 Choke manifold pressure
    gauges

    Yellow IKM stickers indicated choke gauges
    were out of certification for calibration

    Check calibration on all gauges and replace if
    necessary

  • Improvement

    Closed


    Closed


    Deadline was:

    IS-1 Glove Guide
    Glove guide not distributed around rig

    Produce and display laminated A3 copies around
    the rig

    ÅKP. Info from CDE: 26.03.24 Glove Guide displayed in both changing room and General Store (Safety Henning)

  • Improvement

    Closed


    Closed


    Deadline was:

    IS-2 Signs from change room
    to main deck

    The access route from the changing room out to
    the main deck could use improved direction /
    signage. New visitors to the rig can find the
    routing through the rig structure / stairways out to
    main deck confusing until the route becomes
    familiar.

    Produce and display laminated signs from
    changing room to main deck and from main deck
    to changing room

    ÅKP. Info from CDE: 26.03.24 PMH Markings has been made in the deck to guide people to main deck

  • Improvement

    Closed


    Closed


    Deadline was:

    IS-3 Position of Geoservices data screen on bridge
    Screen cannot be viewed from the Emergency
    Control Centre

    Consider to move the screen so it can be viewed
    from the Emergency Control Centre

    ÅKP. Infor from CDE: 26.03.24 PMH This screen can be turned around to be used/ viewed in the emergency control center if needed.

  • Improvement

    Closed


    Closed


    Deadline was:

    IS-4 Monkey board light fittings

    Would benefit from wrapped wire or similar
    around fitting to secure cover should spring clips
    fail.

    ÅKP. Info from CDE: 28.04.2024:According to SfS best practice and Drops field manual it is not recommended to secure the plastic covers.

  • Improvement

    Open

    Open
    Deadline was:

    IS-5 Screw conveyor emergency stop
    Emergency Stop Signs on wall are obscured by
    valves themselves.

    Signs should be replaced with new items in front
    or beside valves for clarity.

  • Improvement

    Closed


    Closed


    Deadline was:

    IS-6 Missing deck bunding
    Area of missing deck bunding between riser deck
    area and skip station.

    Repair bunding to ensure containment of OBM
    around skip station

    ÅKP. Info from CDE: 26.03.24 AOF: new sign in place.

  • Improvement

    Closed


    Closed


    Deadline was:

    IS-7 Storage of fishing equipment
    It is recognised that space is tight on the rig but
    the fishing equipment is stored outside

    As a long term measure look for a space inside to
    store the fishing equipment away from the outside
    elements.

    ÅKP. Info from CDE is that the synergi 324041 is closed without any information

  • Improvement

    Open

    Open
    Deadline was:

    IS-8 Inventory of fishing equipment
    Fishing equipment inventory still included items
    for 5 7/8” DP (which has been backloaded)

    Perform thorough inventory and review of CDE
    supplied fishing equipment to fish 5 ½” OD
    tubulars. To include slim-hole overshot (SFS) to
    fish 5 ½” tooljoint in 8 ½” hole.

  • Improvement

    Open

    Open
    Deadline was:

    IS-9 Provision of spare parts for HEX pumps
    HEX pump no longer produced by NOV.

    Provide assurance plan for continuity of
    consumable fluid end spare parts (particularly
    liner modules) for duration of campaign.

  • Improvement


    Deadline was:

    IS-10 HEX pump maintenance
    Both the Wellesley wells will involve drilling a
    deep 17 ½” section with RMR and WBM with
    relatively high flowrates and circulating pressures
    causing concern with possible pump failure.

    Commence performing a fluid end maintenance
    programme ASAP, if possible starting in advance
    of rig takeover.

  • Improvement

    Closed


    Closed


    Deadline was:

    IS-11 Single trip tank pump
    If trip tank pump fails during tripping the trip
    cannot continue or the active system (lass
    accurate) has to be risk assessed and used.

    Consider investing in provision of a second trip
    tank pump. Would allow uninterrupted tripping

    ÅKP. Info from CDE: 26.03.24 AOF: Good suggestion and would be an good improvement. Budget case.



Additional Documentation

TOP-WLSLY-D-RA-0909-Rig-inspection-report_Rev-01.pdf


TOP-WLSLY-D-RA-0909-Rig-inspection-report_Rev-01.pdf




New Audit Report

You do not have permission to view this form.


\n


COSL Drilling Europe AS

No person selected

Report No.

6222
COSLPromoter – Rig Inspection Report

Type of audit

Rig Intake
COSL Drilling Europe AS

Auditee/Customer

COSL Drilling Europe AS
Wellesley

Date

2024/03/21

627 days ago

Findings

17
Number of findings

Status

Registered
Rig Intake


COSLPromoter – Rig Inspection Report
Summary

The Rig Intake Team (RIT) would like to acknowledge the support provided by all CDE, Equinor and
service personnel during the verification. All persons involved from each company were open,
extremely helpful and positive.
The rig was on location on the 33/9-F-4 BH well performing BOP testing and wellhead cleanup
operations during 21/03/2024 prior to running upper completion. On the evening 21/03/2024 the rig
disconnected the LMRP from the BOP due to weather and started WOW.
The overall impression of the RIT is that the rig is effectively managed by CDE, rig equipment is in
uniformly good condition and housekeeping is maintained at a very high standard. A common
unprompted theme while talking to all personnel, whether service, CDE or Operator was the positive
culture on the rig. A positive culture starts with positive leadership. This culture is one that both the
current operator Equinor, the CDE rig management and all individuals on board should be justly
proud of.
The RIT identified 17 findings: 0 non-conformances, 6 observations and 11 improvement
suggestions. The findings are described in Chapter 4 and summed up in an action list for follow up
in chapter 5.1. None of the findings are considered critical for the upcoming operations.

Findings

  • Observation

    Closed


    Closed


    Deadline was:

    O-1 Paint locker
    Paint locker housekeeping poor

    Tidy up paint locker and remove used cans and
    rags

    ÅKP. Info from CDE: 26.03.24 PMH This has been tidied up

  • Observation

    Closed


    Closed


    Deadline was:

    O-2 Poorly stored clip-top drums
    Clip top drums stored near waste handling
    station without being secured. Unclear whether
    empty or filled with waste.

    Confirm contents of drums and sea fasten same

    ÅKP. Infor from CDE. 26.03.24 PMH We have made signs and secured them.

  • Observation

    Closed


    Closed


    Deadline was:

    O-3 Housekeeping in Welder’s Shop
    Cardboard boxes (flammable material) stored in
    shop. Best stored elsewhere.

    Clear cardboard and dispose of same or store
    elsewhere

    ÅKP. Info from CDE is that it is closed. no text in the synergi.

  • Observation

    Closed


    Closed


    Deadline was:

    O-4 Housekeeping in Crane machinery room
    Poor housekeeping of various cleaning equipment

    Tidy up area

    ÅKP. Info from CDE: 26.03.24 PMH This has been cleaned up.

  • Observation

    Closed


    Closed


    Deadline was:

    O-5 ONIX system “snapshot” of certified equipment on
    rig.

    Inaccuracy of ONIX system in giving “snapshot”
    of certified equipment on rig

    Investigate with ONIX ways of improving accuracy
    eg identifying items shipped off the rig. Improve
    systems for recording serial numbers of
    condemned equipment so that they are removed
    from the database. AXESS staff may be able to
    assist with this.

    ÅKP. Infor from CDE: 26.03.24 PMH We will emphasize this to axess so they can assist us in removing old items, we will also see if its possible to get a solution from onix to manage sent equipment.

  • Observation

    Open

    Open
    Deadline was:

    O-6 Choke manifold pressure
    gauges

    Yellow IKM stickers indicated choke gauges
    were out of certification for calibration

    Check calibration on all gauges and replace if
    necessary

  • Improvement

    Closed


    Closed


    Deadline was:

    IS-1 Glove Guide
    Glove guide not distributed around rig

    Produce and display laminated A3 copies around
    the rig

    ÅKP. Info from CDE: 26.03.24 Glove Guide displayed in both changing room and General Store (Safety Henning)

  • Improvement

    Closed


    Closed


    Deadline was:

    IS-2 Signs from change room
    to main deck

    The access route from the changing room out to
    the main deck could use improved direction /
    signage. New visitors to the rig can find the
    routing through the rig structure / stairways out to
    main deck confusing until the route becomes
    familiar.

    Produce and display laminated signs from
    changing room to main deck and from main deck
    to changing room

    ÅKP. Info from CDE: 26.03.24 PMH Markings has been made in the deck to guide people to main deck

  • Improvement

    Closed


    Closed


    Deadline was:

    IS-3 Position of Geoservices data screen on bridge
    Screen cannot be viewed from the Emergency
    Control Centre

    Consider to move the screen so it can be viewed
    from the Emergency Control Centre

    ÅKP. Infor from CDE: 26.03.24 PMH This screen can be turned around to be used/ viewed in the emergency control center if needed.

  • Improvement

    Closed


    Closed


    Deadline was:

    IS-4 Monkey board light fittings

    Would benefit from wrapped wire or similar
    around fitting to secure cover should spring clips
    fail.

    ÅKP. Info from CDE: 28.04.2024:According to SfS best practice and Drops field manual it is not recommended to secure the plastic covers.

  • Improvement

    Open

    Open
    Deadline was:

    IS-5 Screw conveyor emergency stop
    Emergency Stop Signs on wall are obscured by
    valves themselves.

    Signs should be replaced with new items in front
    or beside valves for clarity.

  • Improvement

    Closed


    Closed


    Deadline was:

    IS-6 Missing deck bunding
    Area of missing deck bunding between riser deck
    area and skip station.

    Repair bunding to ensure containment of OBM
    around skip station

    ÅKP. Info from CDE: 26.03.24 AOF: new sign in place.

  • Improvement

    Closed


    Closed


    Deadline was:

    IS-7 Storage of fishing equipment
    It is recognised that space is tight on the rig but
    the fishing equipment is stored outside

    As a long term measure look for a space inside to
    store the fishing equipment away from the outside
    elements.

    ÅKP. Info from CDE is that the synergi 324041 is closed without any information

  • Improvement

    Open

    Open
    Deadline was:

    IS-8 Inventory of fishing equipment
    Fishing equipment inventory still included items
    for 5 7/8” DP (which has been backloaded)

    Perform thorough inventory and review of CDE
    supplied fishing equipment to fish 5 ½” OD
    tubulars. To include slim-hole overshot (SFS) to
    fish 5 ½” tooljoint in 8 ½” hole.

  • Improvement

    Open

    Open
    Deadline was:

    IS-9 Provision of spare parts for HEX pumps
    HEX pump no longer produced by NOV.

    Provide assurance plan for continuity of
    consumable fluid end spare parts (particularly
    liner modules) for duration of campaign.

  • Improvement


    Deadline was:

    IS-10 HEX pump maintenance
    Both the Wellesley wells will involve drilling a
    deep 17 ½” section with RMR and WBM with
    relatively high flowrates and circulating pressures
    causing concern with possible pump failure.

    Commence performing a fluid end maintenance
    programme ASAP, if possible starting in advance
    of rig takeover.

  • Improvement

    Closed


    Closed


    Deadline was:

    IS-11 Single trip tank pump
    If trip tank pump fails during tripping the trip
    cannot continue or the active system (lass
    accurate) has to be risk assessed and used.

    Consider investing in provision of a second trip
    tank pump. Would allow uninterrupted tripping

    ÅKP. Info from CDE: 26.03.24 AOF: Good suggestion and would be an good improvement. Budget case.



Additional Documentation

TOP-WLSLY-D-RA-0909-Rig-inspection-report_Rev-01.pdf


TOP-WLSLY-D-RA-0909-Rig-inspection-report_Rev-01.pdf



\n”}}]}]}]},{“type”:”section”,”props”:{“class”:”uk-hidden”,”id”:”newreport”,”image_position”:”center-center”,”padding”:”none”,”style”:”default”,”title_breakpoint”:”xl”,”title_position”:”top-left”,”title_rotation”:”left”,”vertical_align”:””,”width”:”default”},”children”:[{“type”:”row”,”children”:[{“type”:”column”,”props”:{“image_position”:”center-center”,”position_sticky_breakpoint”:”m”},”children”:[{“type”:”html”,”props”:{“content”:”

\n

\n

New Audit Report