Report No.

8504
Joint Rig Inspection DSY

Type of audit

Rig Intake
Odfjell

Auditee/Customer

Odfjell
OKEA/SVAL

Date

2025/02/27

283 days ago

Findings

21
Number of findings

Status

Registered
Rig Intake


Joint Rig Inspection DSY
Summary

As part of rig intake, a Technical/HSE rig inspection was carried out from February 24th-27th,2025 while the rig was drilling the exploration well Kjøttkake for DNO Norge AS (DNO), with Well Expertise (WE) managing the operations on behalf of DNO.
The inspection scope was based on Well Expertise’s former knowledge and experience with the rig and the risk assessment carried out on January 16th, 2025. The execution of the inspection in its form put effort on testing the assumed knowledge of systems and adherence to such.
The Rig Intake Team would like to thank Odfjell for the professional and helpful cooperation before, during and after the rig inspection. The overall impression is that the inspection team was welcomed and encouraged to find areas to improve. Everything the inspection team requested was provided with no delay, and personnel available to assist with insight to systems and access to areas.
The proactive attitude of the organization also shows in the relatively low number of findings, as competent personnel was available to give in depth explanations of systems, philosophy, documentation etc. in real time during the inspection.
The inspection team identified 22 findings. One (1) non-conformance, twelve (12) observation and nine (9) improvement points. The findings are listed in chapter 5. The findings were presented to the offshore management team in the summary meeting at the end of the visit.
The overall impression is that the rig is in very good condition and effectively managed. Good systems for emergency preparedness, maintenance, and operations with regards to identifying and controlling risk are in place, well known, and adhered to. Personnel on board the rig displayed a strong sense of ownership for rig and operations and takes responsibility for the total delivery.
Odfjell is requested to respond within two weeks of receiving this report on how they intended to handle the findings and sending WE the required information.
Synergi 242223 is prepared in Odfjell’s system for follwow-up.

Findings

  • Non-Conformity

    Closed


    Closed


    Deadline was:

    NC-1 Station bill only on English
    The station bill is posted only in English. Reference to Rammeforskriften § 16 (Regulations relating to health, safety, and the environment in the petroleum activities): “Norsk språk skal brukes i størst mulig grad i petroleumsvirksomheten. Andre språk kan brukes dersom det er nødvendig eller rimelig for å gjennomføre petroleumsvirksomheten, og det ikke går på bekostning av sikkerheten».

    It is recommended that the station bill be translated into Norwegian and posted alongside the English version.

    03.04.25 Odfjell SNAA: Norwegian version fixed and posted onboard.

  • Observation

    Closed


    Closed


    O-1 Due to updated average person weight, OEM degraded life raft capacity from 35 persons to 29 persons per life raft in 2024.

    DSY plan to change out to higher spec life rafts during bi-annual change-out in July 2025. Meanwhile, DSY has received confirmation from OEM, that the installed life rafts are approved for use with the original capacity of 35 persons per life raft until change-out, and the certificates are still valid.

    Closed before inspection team left rig

  • Observation

    Closed


    Closed


    Fireman’s axe missing in fire stations.

    Replace fireman’s axes.

    Closed before inspection team left rig

  • Observation

    Closed


    Closed


    Deadline was:

    O-3 The Automatic doper is sagging, occasionally causing it to interfere with the anti-collision system.

    Troubleshoot and repair

    04.04.25 Odfjell SNAA: Fixed. WO 26008985.


  • Closed


    Closed


    Deadline was:

    O-4 Broken warning sign on guideline winch #2 (STB AFT). Half of sign missing.

    Replace sign.

    Closed before inspection team left rig

  • Observation

    Open

    Open
    Deadline was:

    O-5 The displacement tank camera on the cement unit is not working. The unit operator cannot see the displacement tanks from the control room.

    Repair/replace camera

    04.04.25 Odfjell SNAA: Baker Hughes third party unit. Address on maintenance meeting

  • Observation

    Closed


    Closed


    Deadline was:

    O-6 Density meter on cement unit not in good condition.
    Inlet side on the 2” recirc density meter is in poor condition and not reading correct.

    Replace density meter and calibrate

    04.04.25 Odfjell SNAA: Baker Hughes third party unit. Address on maintenance meeting.

  • Observation

    Closed


    Closed


    Deadline was:

    O-7 Tarpaulin in vicinity of helideck. Cover for forward lifeboat hoisting controls was taken off and secured with rope on the side. Not good practice to have tarpaulin hanging in the vicinity of helideck. even if it was tied off well.

    Remove Tarpaulin.

    Closed before inspection team left rig

  • Observation

    Closed


    Closed


    Deadline was:

    O-8 Manual fire call point.
    Worn out marking on breaking-glass for manual fire call point at helideck stairs, B-Deck.

    Replace manual fire call point.

    Closed before inspection team left rig

  • Observation

    Open

    Open
    Deadline was:

    O-9 ABS/ESD3 FWD marking.
    Bracket for lube oil cooler temp meter behind engine #4 broken and hanging from gauge wire.

    Repair broken brackets, gauges.

  • Observation

    Closed


    Closed


    Deadline was:

    O-10 Broken bracket, gauges.
    Bracket for lube oil cooler temp meter behind engine #4 broken and hanging from gauge wire.

    Repair broken brackets, gauges.

    Closed before inspection team left rig

  • Observation

    Closed


    Closed


    Deadline was:

    O-11 Missing sign on watermist piping on bulkhead by steps outside of MCR.

    Replace sign on water mist piping.

    Closed before inspection team left rig

  • Observation

    Closed


    Closed


    Deadline was:

    O-12 Grounding cables for ISO tanks not connected.
    Note. No electric equipment on frame, but still non -ex ignition source (static charge)

    Connect grounding cables.

    Closed before inspection team left rig

  • Improvement

    Open

    Open
    Deadline was:

    IS-1 Portable accoustic transducer for BOP only operated by Subsea.
    In an emergency it would be better if more people where familiarized with the equipment and knew how to operate it.

    Suggest to include training of DPO’s and drilling personnel or other while operating equipment during function testing of BOP.

  • Improvement

    Open

    Open
    Deadline was:

    IS-2 Cable protection in MCR. Cables below desk at workstation in Machine Control Room are exposed damage from kick/step.

    Protect cables.

  • Improvement

    Open

    Open
    Deadline was:

    IS-3 Low quality picture from boom camera in both deck cranes.
    Hard to make use of the picture for the crane operator. Especially when weather starts picking up.

    Evaluate to upgrade boom camera system.

  • Improvement

    Open

    Open
    Deadline was:

    IS-4 Alarms on BOP control system are not displayed at drillers position. Driller have to get up from drillers chair and walk over to BOP control panel to read the alarm and acknowledge. This can be disturbing, and also if the driller is alone in the drillers cabin, it can delay respons to the alarm, if not able to leave drillers chair, or distract/delay operations.

    Evaluate improvements, such as integrating in Cyberbase.

  • Improvement

    Open

    Open
    Deadline was:

    IS-5 No relevant procedure for running MLT with control lines. Pipehandling matrix (L4-MODU-DSY-B-PR-335-01N Manuell Rørhåndtering says to perform risk assessment before use of lateral well equipment.

    Perform risk assessment (SJA) for rig up and run MLT control lines.

  • Improvement

    Open

    Open
    Deadline was:

    IS-6 No flowmeter on chemical transfer pump.
    Difficult to control transfer rate when for instance adding premix to active system

    Evaluate to install flowmeter on chemical transfer line.

  • Improvement

    Closed


    Closed


    Deadline was:

    IS-7 Datalogger screen in cement control room. No datalogger screen in cement control room. It is good practice for the cementer to have volume/pressure data from mud system available

    04.04.25 Odfjell SNAA: Installed on rig.

  • Improvement

    Closed


    Closed


    Deadline was:

    Several observations of things stored on top of cabinets. A general observation during inspections. In many areas things are stored on top of cabinets.

    Suggest to have as a theme on weekly management inspection.

    04.04.25 Odfjell SNAA: This is a part of Saturdays HSE housekeeping inspections. Closing action

  • Improvement

    Open

    Open
    Deadline was:

    IS-9 Fire hose cabinets at helideck in poor condition

    Suggest to replace with the same high quality fire hose cabinets as the rest of the rig.

    04.04.25 Odfjell SNAA: Ongoing. Planned next week
    24.04.2025 Cabinet received



Additional Documentation


WE-EA-04-2025-Joint-Rig-Inspection-Report_rev.-01.pdf, 242223-•-Rig-Intake-OKEA-and-Sval-March-2025-•-Synergi-Life.pdf




New Audit Report

You do not have permission to view this form.


\n


Odfjell

No person selected

Report No.

8504
Joint Rig Inspection DSY

Type of audit

Rig Intake
Odfjell

Auditee/Customer

Odfjell
OKEA/SVAL

Date

2025/02/27

283 days ago

Findings

21
Number of findings

Status

Registered
Rig Intake


Joint Rig Inspection DSY
Summary

As part of rig intake, a Technical/HSE rig inspection was carried out from February 24th-27th,2025 while the rig was drilling the exploration well Kjøttkake for DNO Norge AS (DNO), with Well Expertise (WE) managing the operations on behalf of DNO.
The inspection scope was based on Well Expertise’s former knowledge and experience with the rig and the risk assessment carried out on January 16th, 2025. The execution of the inspection in its form put effort on testing the assumed knowledge of systems and adherence to such.
The Rig Intake Team would like to thank Odfjell for the professional and helpful cooperation before, during and after the rig inspection. The overall impression is that the inspection team was welcomed and encouraged to find areas to improve. Everything the inspection team requested was provided with no delay, and personnel available to assist with insight to systems and access to areas.
The proactive attitude of the organization also shows in the relatively low number of findings, as competent personnel was available to give in depth explanations of systems, philosophy, documentation etc. in real time during the inspection.
The inspection team identified 22 findings. One (1) non-conformance, twelve (12) observation and nine (9) improvement points. The findings are listed in chapter 5. The findings were presented to the offshore management team in the summary meeting at the end of the visit.
The overall impression is that the rig is in very good condition and effectively managed. Good systems for emergency preparedness, maintenance, and operations with regards to identifying and controlling risk are in place, well known, and adhered to. Personnel on board the rig displayed a strong sense of ownership for rig and operations and takes responsibility for the total delivery.
Odfjell is requested to respond within two weeks of receiving this report on how they intended to handle the findings and sending WE the required information.
Synergi 242223 is prepared in Odfjell’s system for follwow-up.

Findings

  • Non-Conformity

    Closed


    Closed


    Deadline was:

    NC-1 Station bill only on English
    The station bill is posted only in English. Reference to Rammeforskriften § 16 (Regulations relating to health, safety, and the environment in the petroleum activities): “Norsk språk skal brukes i størst mulig grad i petroleumsvirksomheten. Andre språk kan brukes dersom det er nødvendig eller rimelig for å gjennomføre petroleumsvirksomheten, og det ikke går på bekostning av sikkerheten».

    It is recommended that the station bill be translated into Norwegian and posted alongside the English version.

    03.04.25 Odfjell SNAA: Norwegian version fixed and posted onboard.

  • Observation

    Closed


    Closed


    O-1 Due to updated average person weight, OEM degraded life raft capacity from 35 persons to 29 persons per life raft in 2024.

    DSY plan to change out to higher spec life rafts during bi-annual change-out in July 2025. Meanwhile, DSY has received confirmation from OEM, that the installed life rafts are approved for use with the original capacity of 35 persons per life raft until change-out, and the certificates are still valid.

    Closed before inspection team left rig

  • Observation

    Closed


    Closed


    Fireman’s axe missing in fire stations.

    Replace fireman’s axes.

    Closed before inspection team left rig

  • Observation

    Closed


    Closed


    Deadline was:

    O-3 The Automatic doper is sagging, occasionally causing it to interfere with the anti-collision system.

    Troubleshoot and repair

    04.04.25 Odfjell SNAA: Fixed. WO 26008985.


  • Closed


    Closed


    Deadline was:

    O-4 Broken warning sign on guideline winch #2 (STB AFT). Half of sign missing.

    Replace sign.

    Closed before inspection team left rig

  • Observation

    Open

    Open
    Deadline was:

    O-5 The displacement tank camera on the cement unit is not working. The unit operator cannot see the displacement tanks from the control room.

    Repair/replace camera

    04.04.25 Odfjell SNAA: Baker Hughes third party unit. Address on maintenance meeting

  • Observation

    Closed


    Closed


    Deadline was:

    O-6 Density meter on cement unit not in good condition.
    Inlet side on the 2” recirc density meter is in poor condition and not reading correct.

    Replace density meter and calibrate

    04.04.25 Odfjell SNAA: Baker Hughes third party unit. Address on maintenance meeting.

  • Observation

    Closed


    Closed


    Deadline was:

    O-7 Tarpaulin in vicinity of helideck. Cover for forward lifeboat hoisting controls was taken off and secured with rope on the side. Not good practice to have tarpaulin hanging in the vicinity of helideck. even if it was tied off well.

    Remove Tarpaulin.

    Closed before inspection team left rig

  • Observation

    Closed


    Closed


    Deadline was:

    O-8 Manual fire call point.
    Worn out marking on breaking-glass for manual fire call point at helideck stairs, B-Deck.

    Replace manual fire call point.

    Closed before inspection team left rig

  • Observation

    Open

    Open
    Deadline was:

    O-9 ABS/ESD3 FWD marking.
    Bracket for lube oil cooler temp meter behind engine #4 broken and hanging from gauge wire.

    Repair broken brackets, gauges.

  • Observation

    Closed


    Closed


    Deadline was:

    O-10 Broken bracket, gauges.
    Bracket for lube oil cooler temp meter behind engine #4 broken and hanging from gauge wire.

    Repair broken brackets, gauges.

    Closed before inspection team left rig

  • Observation

    Closed


    Closed


    Deadline was:

    O-11 Missing sign on watermist piping on bulkhead by steps outside of MCR.

    Replace sign on water mist piping.

    Closed before inspection team left rig

  • Observation

    Closed


    Closed


    Deadline was:

    O-12 Grounding cables for ISO tanks not connected.
    Note. No electric equipment on frame, but still non -ex ignition source (static charge)

    Connect grounding cables.

    Closed before inspection team left rig

  • Improvement

    Open

    Open
    Deadline was:

    IS-1 Portable accoustic transducer for BOP only operated by Subsea.
    In an emergency it would be better if more people where familiarized with the equipment and knew how to operate it.

    Suggest to include training of DPO’s and drilling personnel or other while operating equipment during function testing of BOP.

  • Improvement

    Open

    Open
    Deadline was:

    IS-2 Cable protection in MCR. Cables below desk at workstation in Machine Control Room are exposed damage from kick/step.

    Protect cables.

  • Improvement

    Open

    Open
    Deadline was:

    IS-3 Low quality picture from boom camera in both deck cranes.
    Hard to make use of the picture for the crane operator. Especially when weather starts picking up.

    Evaluate to upgrade boom camera system.

  • Improvement

    Open

    Open
    Deadline was:

    IS-4 Alarms on BOP control system are not displayed at drillers position. Driller have to get up from drillers chair and walk over to BOP control panel to read the alarm and acknowledge. This can be disturbing, and also if the driller is alone in the drillers cabin, it can delay respons to the alarm, if not able to leave drillers chair, or distract/delay operations.

    Evaluate improvements, such as integrating in Cyberbase.

  • Improvement

    Open

    Open
    Deadline was:

    IS-5 No relevant procedure for running MLT with control lines. Pipehandling matrix (L4-MODU-DSY-B-PR-335-01N Manuell Rørhåndtering says to perform risk assessment before use of lateral well equipment.

    Perform risk assessment (SJA) for rig up and run MLT control lines.

  • Improvement

    Open

    Open
    Deadline was:

    IS-6 No flowmeter on chemical transfer pump.
    Difficult to control transfer rate when for instance adding premix to active system

    Evaluate to install flowmeter on chemical transfer line.

  • Improvement

    Closed


    Closed


    Deadline was:

    IS-7 Datalogger screen in cement control room. No datalogger screen in cement control room. It is good practice for the cementer to have volume/pressure data from mud system available

    04.04.25 Odfjell SNAA: Installed on rig.

  • Improvement

    Closed


    Closed


    Deadline was:

    Several observations of things stored on top of cabinets. A general observation during inspections. In many areas things are stored on top of cabinets.

    Suggest to have as a theme on weekly management inspection.

    04.04.25 Odfjell SNAA: This is a part of Saturdays HSE housekeeping inspections. Closing action

  • Improvement

    Open

    Open
    Deadline was:

    IS-9 Fire hose cabinets at helideck in poor condition

    Suggest to replace with the same high quality fire hose cabinets as the rest of the rig.

    04.04.25 Odfjell SNAA: Ongoing. Planned next week
    24.04.2025 Cabinet received



Additional Documentation


WE-EA-04-2025-Joint-Rig-Inspection-Report_rev.-01.pdf, 242223-•-Rig-Intake-OKEA-and-Sval-March-2025-•-Synergi-Life.pdf



\n”}}]}]}]},{“type”:”section”,”props”:{“class”:”uk-hidden”,”id”:”newreport”,”image_position”:”center-center”,”padding”:”none”,”style”:”default”,”title_breakpoint”:”xl”,”title_position”:”top-left”,”title_rotation”:”left”,”vertical_align”:””,”width”:”default”},”children”:[{“type”:”row”,”children”:[{“type”:”column”,”props”:{“image_position”:”center-center”,”position_sticky_breakpoint”:”m”},”children”:[{“type”:”html”,”props”:{“content”:”

\n

\n

New Audit Report