Schlumberger Service Delivery Process – Well Management

Type of audit

Rig Intake
Schlumberger

Auditee/Customer

Schlumberger
Wellesley Petroleum AS

Date

2020/05/14

2035 days ago

Findings

12
Number of findings

Status

Closed
Rig Intake


Schlumberger Service Delivery Process – Well Management
Summary

The objective of the audit was to ensure high level of quality and to deliver a safe and efficient operation for the
upcoming Schweinsteiger well for Wellesley Petroleum, and as stakeholder review for Well Expertise (WE). The
verification was conducted 14th May 2020 via Teams due to the current Covid-19 situation. It was identifies ten improvment suggestions and two observations.

Findings

  • Improvement

    Closed


    Closed


    Deadline was:

    Annual HSEQ Plan: Major Accident, Health and DROPS Campaign: Please forward report on experiences etc.

  • Actions

    Closed


    Closed


    Deadline was:

    N/A

    SLB to forward one-pagers for non-conformances

    recived

  • Actions

    Closed


    Closed


    Deadline was:

    N/A

    Wellesley would like to receive procedures/information on familiarization on new rig (SLB not been on Borgland Dolphin since 2008)

    recived

  • Actions

    Closed


    Closed


    Deadline was:

    N/A

    SLB to share COVID-19 procedure/guideline – to be sent to Johan KjosHanssen (johan@wellexpertise.com)

    recived

  • Actions

    Closed


    Closed


    Deadline was:

    N/A

    Please send us substitution plan (drilling fluids)

    recived

  • Actions

    Closed


    Closed


    Deadline was:

    N/A

    SLB to forward Environmental Aspects and Risk Register for Drilling Fluids Offshore

    recived

  • Actions

    Closed


    Closed


    Deadline was:

    N/A

    ECD Simulations to be performed and verified by 3rd party with focus on low
    temperatures – lab testing to be included

    info

  • Actions

    Closed


    Closed


    Deadline was:

    N/A

    SLB to secure flash point test kit for testing of slops

  • Actions

    Closed


    Closed


    Deadline was:

    N/A

    Please plan for having an MWD engineer offshore from start of the well, then we evaluate to use remote operation centre and 2 x DDX only at later stage

    Info

  • Actions

    Closed


    Closed


    Deadline was:

    N/A

    Check with Dolphin regarding XO from 6 5/8” REG to XT57 is available and who supplies it

  • Observation

    Closed


    Closed


    Deadline was:

    N/A

    Wellesley will send info regarding bulk capacity, circulating system, pits etc.

    ok

  • Observation

    Closed


    Closed


    Deadline was:

    N/A

    Wellesley to provide contact person within Soiltech

    ok



Additional Documentation

EA-2020-2_-Verification-Report-Schlumberger.pdf


EA-2020-2_-Verification-Report-Schlumberger.pdf




New Audit Report

You do not have permission to view this form.


\n


Schlumberger

No person selected

Report No.

1663
Schlumberger Service Delivery Process – Well Management

Type of audit

Rig Intake
Schlumberger

Auditee/Customer

Schlumberger
Wellesley Petroleum AS

Date

2020/05/14

2035 days ago

Findings

12
Number of findings

Status

Closed
Rig Intake


Schlumberger Service Delivery Process – Well Management
Summary

The objective of the audit was to ensure high level of quality and to deliver a safe and efficient operation for the
upcoming Schweinsteiger well for Wellesley Petroleum, and as stakeholder review for Well Expertise (WE). The
verification was conducted 14th May 2020 via Teams due to the current Covid-19 situation. It was identifies ten improvment suggestions and two observations.

Findings

  • Improvement

    Closed


    Closed


    Deadline was:

    Annual HSEQ Plan: Major Accident, Health and DROPS Campaign: Please forward report on experiences etc.

  • Actions

    Closed


    Closed


    Deadline was:

    N/A

    SLB to forward one-pagers for non-conformances

    recived

  • Actions

    Closed


    Closed


    Deadline was:

    N/A

    Wellesley would like to receive procedures/information on familiarization on new rig (SLB not been on Borgland Dolphin since 2008)

    recived

  • Actions

    Closed


    Closed


    Deadline was:

    N/A

    SLB to share COVID-19 procedure/guideline – to be sent to Johan KjosHanssen (johan@wellexpertise.com)

    recived

  • Actions

    Closed


    Closed


    Deadline was:

    N/A

    Please send us substitution plan (drilling fluids)

    recived

  • Actions

    Closed


    Closed


    Deadline was:

    N/A

    SLB to forward Environmental Aspects and Risk Register for Drilling Fluids Offshore

    recived

  • Actions

    Closed


    Closed


    Deadline was:

    N/A

    ECD Simulations to be performed and verified by 3rd party with focus on low
    temperatures – lab testing to be included

    info

  • Actions

    Closed


    Closed


    Deadline was:

    N/A

    SLB to secure flash point test kit for testing of slops

  • Actions

    Closed


    Closed


    Deadline was:

    N/A

    Please plan for having an MWD engineer offshore from start of the well, then we evaluate to use remote operation centre and 2 x DDX only at later stage

    Info

  • Actions

    Closed


    Closed


    Deadline was:

    N/A

    Check with Dolphin regarding XO from 6 5/8” REG to XT57 is available and who supplies it

  • Observation

    Closed


    Closed


    Deadline was:

    N/A

    Wellesley will send info regarding bulk capacity, circulating system, pits etc.

    ok

  • Observation

    Closed


    Closed


    Deadline was:

    N/A

    Wellesley to provide contact person within Soiltech

    ok



Additional Documentation

EA-2020-2_-Verification-Report-Schlumberger.pdf


EA-2020-2_-Verification-Report-Schlumberger.pdf



\n”}}]}]}]},{“type”:”section”,”props”:{“class”:”uk-hidden”,”id”:”newreport”,”image_position”:”center-center”,”padding”:”none”,”style”:”default”,”title_breakpoint”:”xl”,”title_position”:”top-left”,”title_rotation”:”left”,”vertical_align”:””,”width”:”default”},”children”:[{“type”:”row”,”children”:[{“type”:”column”,”props”:{“image_position”:”center-center”,”position_sticky_breakpoint”:”m”},”children”:[{“type”:”html”,”props”:{“content”:”

\n

\n

New Audit Report