Schlumberger

|
Report No.
|
1663 |
|
Type of audit
|
Rig Intake |
|
Auditee/Customer
|
Schlumberger |
|
Date
|
2020/05/14 |
|
Findings
|
12 |
|
Status
|
Closed |
Schlumberger Service Delivery Process – Well Management
Summary
upcoming Schweinsteiger well for Wellesley Petroleum, and as stakeholder review for Well Expertise (WE). The
verification was conducted 14th May 2020 via Teams due to the current Covid-19 situation. It was identifies ten improvment suggestions and two observations.
Findings
-
Annual HSEQ Plan: Major Accident, Health and DROPS Campaign: Please forward report on experiences etc.
-
N/A
SLB to forward one-pagers for non-conformances
recived
-
N/A
Wellesley would like to receive procedures/information on familiarization on new rig (SLB not been on Borgland Dolphin since 2008)
recived
-
N/A
SLB to share COVID-19 procedure/guideline – to be sent to Johan KjosHanssen (johan@wellexpertise.com)
recived
-
N/A
Please send us substitution plan (drilling fluids)
recived
-
N/A
SLB to forward Environmental Aspects and Risk Register for Drilling Fluids Offshore
recived
-
N/A
ECD Simulations to be performed and verified by 3rd party with focus on low
temperatures – lab testing to be includedinfo
-
N/A
SLB to secure flash point test kit for testing of slops
-
N/A
Please plan for having an MWD engineer offshore from start of the well, then we evaluate to use remote operation centre and 2 x DDX only at later stage
Info
-
N/A
Check with Dolphin regarding XO from 6 5/8” REG to XT57 is available and who supplies it
-
N/A
Wellesley will send info regarding bulk capacity, circulating system, pits etc.
ok
-
N/A
Wellesley to provide contact person within Soiltech
ok
Additional Documentation
New Audit Report
\n
Schlumberger

|
Report No.
|
1663 |
|
Type of audit
|
Rig Intake |
|
Auditee/Customer
|
Schlumberger |
|
Date
|
2020/05/14 |
|
Findings
|
12 |
|
Status
|
Closed |
Schlumberger Service Delivery Process – Well Management
Summary
upcoming Schweinsteiger well for Wellesley Petroleum, and as stakeholder review for Well Expertise (WE). The
verification was conducted 14th May 2020 via Teams due to the current Covid-19 situation. It was identifies ten improvment suggestions and two observations.
Findings
-
Annual HSEQ Plan: Major Accident, Health and DROPS Campaign: Please forward report on experiences etc.
-
N/A
SLB to forward one-pagers for non-conformances
recived
-
N/A
Wellesley would like to receive procedures/information on familiarization on new rig (SLB not been on Borgland Dolphin since 2008)
recived
-
N/A
SLB to share COVID-19 procedure/guideline – to be sent to Johan KjosHanssen (johan@wellexpertise.com)
recived
-
N/A
Please send us substitution plan (drilling fluids)
recived
-
N/A
SLB to forward Environmental Aspects and Risk Register for Drilling Fluids Offshore
recived
-
N/A
ECD Simulations to be performed and verified by 3rd party with focus on low
temperatures – lab testing to be includedinfo
-
N/A
SLB to secure flash point test kit for testing of slops
-
N/A
Please plan for having an MWD engineer offshore from start of the well, then we evaluate to use remote operation centre and 2 x DDX only at later stage
Info
-
N/A
Check with Dolphin regarding XO from 6 5/8” REG to XT57 is available and who supplies it
-
N/A
Wellesley will send info regarding bulk capacity, circulating system, pits etc.
ok
-
N/A
Wellesley to provide contact person within Soiltech
ok
Additional Documentation