WE Report

Audits



Dolphin Drilling

Anniken Meisler

Report No.

1560
Tight rig verification Borgland Dolphin

Type of audit

Rig Intake
Dolphin Drilling

Auditee/Customer

Dolphin Drilling
DNO Norge AS, Wellesley Petroleum AS and INEOS E&P Norge AS

Date

2021/03/10

1734 days ago

Findings

0
Number of findings

Status

Closed
Rig Intake


Tight rig verification Borgland Dolphin
Summary

On behalf of DNO Norge AS (DNO), Wellesley Petroleum AS (Wellesley) and INEOS E&P Norge AS (INEOS), and as part of rig intake, Well Expertise AS (WE) carried out an environmental tight rig verification on the drilling rig Borgland Dolphin (BGL) from 8 th- 10th March 2021. This to ensure that the rig was ready for operation start 20th March. BGL has been warm stacked at Green Yard in Fedafjord since September 2020.

The verification was performed according to pre-defined scope of work given in Notification letter sent 25th February and highlighted focus areas. The objective was to verify current status on BGL related to overboard potential discharge points, and to highlight potential deviations from requirements, standards, contracts, maintenance procedures, documentation and general good practices. The method consisted of interviews with relevant personnel, document review and field survey of drain systems, overboard lines and other related equipment preventing spillage to sea, on-board the rig.

A verification check list was developed and used during this verification. The verification team identified 15 Findings (0 Non-conformities, 4 improvement suggestions and 11 Observations) – all described in this report. The identified areas for potential improvement were discussed in the closure meeting of the verification. The findings shall be followed up by Dolphin Drilling (DDAS) in Synergi.

It is the DDAS’s obligation to adopt the Findings raised in this report into Synergi, to evaluate the extent of the revealed Findings, and to establish relevant actions. DDAS is requested to respond within 2 weeks of receiving this report on how they intend to handle the improvement suggestions and observations.



Additional Documentation

EA-2021-1_-Tight-rig-verification-Borgland-Dolphin.pdf


EA-2021-1_-Tight-rig-verification-Borgland-Dolphin.pdf




New Audit Report

You do not have permission to view this form.


\n


Dolphin Drilling

Anniken Meisler

Report No.

1560
Tight rig verification Borgland Dolphin

Type of audit

Rig Intake
Dolphin Drilling

Auditee/Customer

Dolphin Drilling
DNO Norge AS, Wellesley Petroleum AS and INEOS E&P Norge AS

Date

2021/03/10

1734 days ago

Findings

0
Number of findings

Status

Closed
Rig Intake


Tight rig verification Borgland Dolphin
Summary

On behalf of DNO Norge AS (DNO), Wellesley Petroleum AS (Wellesley) and INEOS E&P Norge AS (INEOS), and as part of rig intake, Well Expertise AS (WE) carried out an environmental tight rig verification on the drilling rig Borgland Dolphin (BGL) from 8 th- 10th March 2021. This to ensure that the rig was ready for operation start 20th March. BGL has been warm stacked at Green Yard in Fedafjord since September 2020.

The verification was performed according to pre-defined scope of work given in Notification letter sent 25th February and highlighted focus areas. The objective was to verify current status on BGL related to overboard potential discharge points, and to highlight potential deviations from requirements, standards, contracts, maintenance procedures, documentation and general good practices. The method consisted of interviews with relevant personnel, document review and field survey of drain systems, overboard lines and other related equipment preventing spillage to sea, on-board the rig.

A verification check list was developed and used during this verification. The verification team identified 15 Findings (0 Non-conformities, 4 improvement suggestions and 11 Observations) – all described in this report. The identified areas for potential improvement were discussed in the closure meeting of the verification. The findings shall be followed up by Dolphin Drilling (DDAS) in Synergi.

It is the DDAS’s obligation to adopt the Findings raised in this report into Synergi, to evaluate the extent of the revealed Findings, and to establish relevant actions. DDAS is requested to respond within 2 weeks of receiving this report on how they intend to handle the improvement suggestions and observations.



Additional Documentation

EA-2021-1_-Tight-rig-verification-Borgland-Dolphin.pdf


EA-2021-1_-Tight-rig-verification-Borgland-Dolphin.pdf



\n”}}]}]}]},{“type”:”section”,”props”:{“class”:”uk-hidden”,”id”:”newreport”,”image_position”:”center-center”,”padding”:”none”,”style”:”default”,”title_breakpoint”:”xl”,”title_position”:”top-left”,”title_rotation”:”left”,”vertical_align”:””,”width”:”default”},”children”:[{“type”:”row”,”children”:[{“type”:”column”,”props”:{“image_position”:”center-center”,”position_sticky_breakpoint”:”m”},”children”:[{“type”:”html”,”props”:{“content”:”