PSW

|
Report No.
|
1789 |
|
Type of audit
|
External Audits |
|
Auditee/Customer
|
PSW |
|
Date
|
2017/05/30 |
|
Findings
|
11 |
|
Status
|
Closed |
Wllesley Petroleum & Well Expertise Audit Report- PSW-Caping Stack
Summary
associated services as part of the initial verification prior to signing a contract for capping stack access.
Non Conformances: 0
Observations: 5
Improvement Proposals: 6
Findings
-
Original SAM modules still presented as
default hydraulic energy source in
presentations. Update to reflect new SAM
module. -
Volume requirements for API RP17 W ram
closures not included and associated
remaining capacity -
New SAM functionality explanation including
distance from stack requirements -
Opportunities to recharge SAM module not
clear. -
PSW Operational procedures for capping stack
need to be updated for stack modifications -
Update documentation with new SAM
module and associated functionality (ROV
interface for flowmeter, onboard flow meter
and capacity per bank of bottles) -
Prepare summary spreadsheet of volumes to
perform all open/close functions on stack -
Prepare “incident seabed landing map” so
optimised SAM deployment position,
hydraulic hose lengths etc is clearly
demonstrated -
Further document ability to use additional
SAM modules for additional stack hydraulic capacity in the event of an extended incident needing significant operations of the stack -
Prepare generic “deck layout plan” to
optimise spotting of capping stack and
associated equipment on transport vessel -
Prepare an equipment loadout checklist
Additional Documentation
New Audit Report
\n
PSW

|
Report No.
|
1789 |
|
Type of audit
|
External Audits |
|
Auditee/Customer
|
PSW |
|
Date
|
2017/05/30 |
|
Findings
|
11 |
|
Status
|
Closed |
Wllesley Petroleum & Well Expertise Audit Report- PSW-Caping Stack
Summary
associated services as part of the initial verification prior to signing a contract for capping stack access.
Non Conformances: 0
Observations: 5
Improvement Proposals: 6
Findings
-
Original SAM modules still presented as
default hydraulic energy source in
presentations. Update to reflect new SAM
module. -
Volume requirements for API RP17 W ram
closures not included and associated
remaining capacity -
New SAM functionality explanation including
distance from stack requirements -
Opportunities to recharge SAM module not
clear. -
PSW Operational procedures for capping stack
need to be updated for stack modifications -
Update documentation with new SAM
module and associated functionality (ROV
interface for flowmeter, onboard flow meter
and capacity per bank of bottles) -
Prepare summary spreadsheet of volumes to
perform all open/close functions on stack -
Prepare “incident seabed landing map” so
optimised SAM deployment position,
hydraulic hose lengths etc is clearly
demonstrated -
Further document ability to use additional
SAM modules for additional stack hydraulic capacity in the event of an extended incident needing significant operations of the stack -
Prepare generic “deck layout plan” to
optimise spotting of capping stack and
associated equipment on transport vessel -
Prepare an equipment loadout checklist
Additional Documentation