Latest
-
-
-
Commander 1000 is a very heavy CMT-head. Due to its weight, it is not preferable to use on DSY unless it is needed. It is preferred to use Commander 500, as it is less risky to have it racked in Derrick and it takes a lot less time to move. . .
-
-
Reached TD without signifigent problems. Sampled acc. To plan.
Some pressure point samples unsuccessful due to “no seal”.
Sampling during “pump and pull” OOH was performed better than enticipated. Stood stationary for 7 hrs – had 26 kNm. . . -
-
Very well executed and all objectives was met.
-
-
When cementer was dropping/pushing CST into DP filled with OBM “splashed” out of pipe and spilled on cementers face.
-
-
3 ½” DP was racked back in due time, but handling such small tubular takes time.
-
-
-
-
Commander 1000 is a very heavy CMT-head. Due to its weight, it is not preferable to use on DSY unless it is needed. It is preferred to use Commander 500, as it is less risky to have it racked in Derrick and it takes a lot less time to move. . .
-
-
Reached TD without signifigent problems. Sampled acc. To plan.
Some pressure point samples unsuccessful due to “no seal”.
Sampling during “pump and pull” OOH was performed better than enticipated. Stood stationary for 7 hrs – had 26 kNm. . . -
-
Very well executed and all objectives was met.
-
-
When cementer was dropping/pushing CST into DP filled with OBM “splashed” out of pipe and spilled on cementers face.
-
-
3 ½” DP was racked back in due time, but handling such small tubular takes time.
-
Latest
-
- The Drilling Superintendent, Stig Seland will be replaced by Morten Laget, for the remainder of Kjøttkake Exploration Well operation. Morten Laget . . .
-
HSEQ Coordinator change as a result of a resignation from the Well Expertise organization.
-
WE/MoC-14-2024 Minor
- Due to the reduced capacity of Sikorsky S-92 helicopter for operation on NCS, the Falstaff project secured a contract with CHC to use an Airbus L1 . . .
-
WE/MoC-13-2024 Minor
- Due to TWMA CST installation on Troms Sirius (1 of 2 vessels planned as Standby Vessel (SBV)) The vessel does not longer meet the standby class . . .
-
- The Drilling Superintendent, Stig Seland will be replaced by Morten Laget, for the remainder of Kjøttkake Exploration Well operation. Morten Laget . . .
-
HSEQ Coordinator change as a result of a resignation from the Well Expertise organization.
-
WE/MoC-14-2024 Minor
- Due to the reduced capacity of Sikorsky S-92 helicopter for operation on NCS, the Falstaff project secured a contract with CHC to use an Airbus L1 . . .
-
WE/MoC-13-2024 Minor
- Due to TWMA CST installation on Troms Sirius (1 of 2 vessels planned as Standby Vessel (SBV)) The vessel does not longer meet the standby class . . .
Latest
-
- An project related email sendt by me to Morten Laget, ended up being posted to WEHome feed. This without my knowledge or intent to do so.
The . . . - NPT: 0.5 hrs
Cost approximately: 104 000 NOKTroubleshoot Dop Application Machine (DAM).
– Did not retract after function testing - NPT: 7.75 hrs
Cost approximately: 1 614 000 NOKCyber chair stopped functioning
- NPT: 1.25 hrs
Cost approximately: 260 000 NOKRepaired hydraulic leak on PS-30 slips.
-
- An project related email sendt by me to Morten Laget, ended up being posted to WEHome feed. This without my knowledge or intent to do so.
The . . . - NPT: 0.5 hrs
Cost approximately: 104 000 NOKTroubleshoot Dop Application Machine (DAM).
– Did not retract after function testing - NPT: 7.75 hrs
Cost approximately: 1 614 000 NOKCyber chair stopped functioning
- NPT: 1.25 hrs
Cost approximately: 260 000 NOKRepaired hydraulic leak on PS-30 slips.
Latest
-
- Purpose:
Maintenance verification compliance towards NORSOK standard Z-008 (Risk based maintenance and consequence classification) of Deepsea Yantai Cement Unit for the Bestla drilling. . . - As part of rig intake, a Technical/HSE rig inspection was carried out from February 24th-27th,2025 while the rig was drilling the exploration well Kjøttkake for DNO Norge AS (DNO), with Well. . .
- Management review for 2024 was held 13. March 2025 and agreed actions are listed here.
- OKEA ASA (OKEA) and SVAL Energy AS (SVAL) has completed the rig selection process and have established an agreement with Odfjell Drilling (Odfjell) to utilise the rig Deepsea Yantai (DSY). OKEA. . .
-
- Purpose:
Maintenance verification compliance towards NORSOK standard Z-008 (Risk based maintenance and consequence classification) of Deepsea Yantai Cement Unit for the Bestla drilling. . . - As part of rig intake, a Technical/HSE rig inspection was carried out from February 24th-27th,2025 while the rig was drilling the exploration well Kjøttkake for DNO Norge AS (DNO), with Well. . .
- Management review for 2024 was held 13. March 2025 and agreed actions are listed here.
- OKEA ASA (OKEA) and SVAL Energy AS (SVAL) has completed the rig selection process and have established an agreement with Odfjell Drilling (Odfjell) to utilise the rig Deepsea Yantai (DSY). OKEA. . .