Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

PGNiG
4841 – PGNiG

Deepsea Yantai Drilling
Own Experience
Operational 6608/1-1 S Intermediate section 04/09/2022 Had to switch to a BX elevator

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
356 – PGNiG

Deepsea Nordkapp Drilling Operational 6507/5-9 S, 6507/5-9 A
Shrek
Production section 22/10/2019 Used mousehole and bucking machine for offline operations.


PDF


Edit


PGNiG
357 – PGNiG

Deepsea Nordkapp Drilling Operational 6507/5-9 S, 6507/5-9 A
Shrek
Production section 22/10/2019 Casing running performance was good.


PDF


Edit


PGNiG
369 – PGNiG

Deepsea Nordkapp Drilling Operational 6507/5-9 S, 6507/5-9 A
Shrek
Reservoir section 22/10/2019 Difficult to decide on placement of centralizers for racking since the casing joints vary in lengths . . .


PDF


Edit