Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
8481 – DNO

Deepsea Yantai Drilling Planning 35/10-13
Kjøttkake
Reservoir section 24/03/2025
Reached TD without signifigent problems. Sampled acc. To plan.
Some pressure point samples . . .

Sander Schaathun / Stig Seland


PDF


Edit


DNO
8482 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Reservoir section 24/03/2025 Very well executed and all objectives was met.

Sander Schaathun / Stig Seland


PDF


Edit


DNO
8433 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 35/10-13
Kjøttkake
Production section 15/03/2025 Not able to get BOP test – Burst seal on CHSART

Ole Marius Serigstad / Stig Seland


PDF


Edit


DNO
8380 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
P&A 04/03/2025 Indication of cut was not recognized. Decided to POOH and run in with B/U cutting eq. with marine . . .

Sander Schaathun / Stig Seland


PDF


Edit


DNO
8382 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
P&A 04/03/2025
Lost rubber drill pipe wiper downhole.
After pulled out with the cement stinger and when changing . . .

Sander Schaathun / Stig Seland


PDF


Edit


DNO
8325 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Reservoir section 19/02/2025 Due to upcoming bad weather we needed to set the plug using IO support.

Sander Schaathun / Stig Seland


PDF


Edit


PGNiG
8271 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Surface section 15/02/2025 The centralizer placement on the 20” interfered with the rollers on the casing tong.

Drilling Engineer


PDF


Edit


PGNiG
8272 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Surface section 15/02/2025 Not able to sting in CRTi to XO joint due to smaller ID.

Drilling Engineer


PDF


Edit


PGNiG
8273 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Surface section 15/02/2025 SMO stickup higher than what was communicated in DOP. Caused issues regarding visual confirmation of . . .

Drilling Engineer


PDF


Edit


PGNiG
8274 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Run Riser and BOP 15/02/2025 Slip joint seal not engaged during diverter test to check for leak.

Drilling Engineer


PDF


Edit


PGNiG
8277 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Intermediate section 15/02/2025 Losses and pack off during the circulation. Total losses in the end with 100 lpm.

Drilling Engineer


PDF


Edit


PGNiG
8281 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Production section 15/02/2025 Installed brackets on OWS tong after derailing during 13 3/8″ job.

Drilling Engineer


PDF


Edit


DNO
8262 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Surface section 14/02/2025
Deployed SMO on winch. ED’s recommendation is to run on DP. It was difficult to hold correct . . .

Drilling Engineer


PDF


Edit


PGNiG
8267 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
9 7/8″ Pilot hole 14/02/2025 Very high ECD readings from MWD. Approaching FG. Suspected clay sticking to stab behind bit.

Drilling Engineer


PDF


Edit


PGNiG
8268 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Surface section 14/02/2025 MW keeps increasing, having to add a lot of premix. Ran short on premix and had to mix in water to . . .

Drilling Engineer


PDF


Edit


PGNiG
8269 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Surface section 14/02/2025 Tight spots which required up to 25 MT overpull to pull above.

Drilling Engineer


PDF


Edit


PGNiG
8270 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Surface section 14/02/2025 Due to bad weather and rig movement, it was evaluated and decided to install CRTi to be able to . . .

Drilling Engineer


PDF


Edit


DNO
6978 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
P&A 21/11/2024 Sat the EZSV and tagged with 6t and and overpull of 27t. Performed two pressure tests, but both . . .

Drilling Engineer


PDF


Edit


DNO
6967 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
P&A 11/11/2024 For plug #1D incorrect concentration of retarder was used in the cement mix – extending the . . .

Lene Lomeland


PDF


Edit


DNO
6971 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Reservoir section 11/11/2024 The anchor for the first Whipstock did not set probably – did not grip onto the casing. When putting . . .

Lene Lomeland


PDF


Edit