WE Report

Lessons Learned

Lesson Learned





By: Drilling Engineer

Report No.

8267

Discipline/Origin

Drilling
No origin

Well

Tomcat
6501/10-1

Date created

2025/02/14
295 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
No classification

Deepsea Yantai


What happened in 9 7/8″ Pilot hole:
Very high ECD readings from MWD. Approaching FG. Suspected clay sticking to stab behind bit.

What Was Planned

Drilling pilot hole with RMR 1.30 sg WBM.

What Was Learned

Multiple trips out of hole confirmed suspicion. Stab completely covered in clay. Had to wash stabilizer.

Theory: Stab was essentially blocked for fluid pathways, meaning once the pumps were on and drilling the cuttings would pack off around stab giving the high ECD reading.

What Actions Are Required

Evaluate to reduce MW in RMR system to have more margin to the FG.

If possible, consider different type of stabilizer to reduce clay sticking.