Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

PGNiG
8204 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Top hole 03/02/2025 Lost marker buoys out of basket when deploying.

Drilling Engineer


PDF


Edit


DNO
6969 – DNO

Nobel Invincible Drilling Planning 2/6-7 S
Falstaff
P&A 11/11/2024 Attempted to dress off cement after the sample in the UCA cell started to build compressive . . .

Lene Lomeland


PDF


Edit


DNO
6970 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Reservoir section 11/11/2024
When RIH with Whipstock/Milling BHA to set the Whipstock, it took weight in the 9 5/8” liner – not . . .

Lene Lomeland


PDF


Edit


DNO
6960 – DNO

Deepsea Yantai External Environment
Own Experience
Other 25/7-11 S
Norma
Other 06/11/2024
Tilbakemelding fra NEA:
Vi registrerer at rapportert forbruk av diesel til kraftgenerering er . . .

Helene Folkvord / Anniken Meisler



PDF


Edit


DNO
6877 – DNO

Nobel Invincible External Environment
Own Experience
Planning 2/6-7 S
Falstaff
Other 10/10/2024 The PSV’s have crew change every 4 weeks meaning that at some point we are not able to meet this . . .

Helene Folkvord / Anniken Meisler



PDF


Edit


DNO
6801 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 After evaluating related risks of RIH with torque tool and stinger in one run – a decision was made . . .

Lene Lomeland


PDF


Edit


DNO
6802 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 The pre-torque was not conducted in town. Unable to fit it in the buckling machine in the workshop. . . .

Lene Lomeland


PDF


Edit


DNO
6806 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Used BX3 when FA-1 was observed to be incompatible with 20” casing.

Lene Lomeland


PDF


Edit


DNO
6809 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Difficulties to install the double drilling machine at scaffolding at diverter level for cutting the . . .

Lene Lomeland


PDF


Edit


DNO
6813 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Space out incorrect compared to Stack-up drawing from Well partner. The upper spool of the WH stack . . .

Lene Lomeland


PDF


Edit


DNO
6767 – DNO

Nobel Invincible Logistics Planning 2/6-7 S
Falstaff
Top hole 23/09/2024 Excellent planning. Safely executed. Experienced and knowledgeable Expro crews who cooperated good . . .

Lene Lomeland


PDF


Edit


PGNiG
6747 – PGNiG

Deepsea Yantai Marine
Own Experience
Operational 6501/10-1
Tomcat
Pre-Lay 15/09/2024
We started on anchor 4. This anchor was together with anchor 5 and 6 supposed to be installed to . . .

Stian Engvik / Stig Seland


PDF


Edit


Wellesley Petroleum
6454 – Wellesley Petroleum

COSLPromoter, COSL Promoter External Environment
Own Experience
Operational 35/11-5, 39/11-29S
Toppand East
Other 02/07/2024
Recieved phonecall from SAR Florø which have not been informed about Toppand East well. The waste . . .

Helene Folkvord


PDF


Edit


Wellesley
6391 – Wellesley

COSLPromoter Drilling
Own Experience
Planning 35/10-12AS
Gnomoria
Surface section 12/06/2024 Not possible to M/U the no-cross joint, because it was not possible to grip with the casing tong on . . .

Giacomo Bonomo / Morten Laget



PDF


Edit


PGNiG
6223 – PGNiG

Deepsea Yantai HSEQ
Own Experience
Planning 6501/10-1
Tomcat
Other 08/05/2024
An evaluation of some changes was not documented.
A MOC process should cover any RELEVANT changes . . .

Åse Kristin Pettersen / Stig Seland


PDF


Edit


DNO
6876 – DNO

Nobel Invincible HSEQ
NEA Q&A
Planning 2/6-7 S
Falstaff
N/A 02/05/2024

Fiskeridirektoratet fraråder at det blir gitt tillatelse til prøveboring. Som begrunnelse vises det . . .

Anniken Meisler / Anniken Meisler



PDF


Edit


DNO
6875 – DNO

Nobel Invincible HSEQ
NEA Q&A
Planning 2/6-7 S
Falstaff
N/A 09/04/2024

Planlagt hamring for lederør med lydutsending som starter på et lavt nivå og øker gradvis til . . .

Anniken Meisler / Anniken Meisler



PDF


Edit


PGNiG
6874 – PGNiG

No Rig Other
Own Experience
Planning 6501/10-1
Tomcat
N/A 06/11/2023 It is strong currents at the location, and it was very hard to keep the ROV stable when surveying . . .

Anniken Meisler / Anniken Meisler



PDF


Edit


DNO
5910 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
Reservoir section 05/09/2023 High gas in return and losses. Believed to be due to ballooning effect. Once the well was flow . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5907 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
P&A 03/09/2023 It was not clearly stated in the HLB cement program how the cement calculations should be carried . . .