WE Report

Lessons Learned

Lesson Learned





By: Lene Lomeland

Report No.

6809

Discipline/Origin

Drilling
No origin

Well

Falstaff
2/6-7 S

Date created

2024/10/07
425 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Planning
No classification

What happened in Top hole:
Difficulties to install the double drilling machine at scaffolding at diverter level for cutting the lifting eyes for lifting the 18 MT cut conductor after fine cut performed. Sent out new inserts to the drilling machine used for cutting the drain holes to easier fit in the cutting area for the lifting eyes

What Was Planned

Use a double drilling machine to cold cut lifting eyes to connect Claxton lifting pin/bridle for lifting the cut conductor. Slings connected to bails to support the lifting pin/bridle.

What Was Learned

Review procedure for drilling holes for lifting pin for lifting away 18 MT cut stub after fine cut.

What Actions Are Required

Implement agreed procedure for next operation. Evaluate to use the same drilling machine as for the drain holes.