Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

Wellesley
4960 – Wellesley

Borgland Dolphin Logistics
Own Experience
End of Well 36/1-4
Hemispheres
Other 14/12/2022 Sevaral months after end of operation personnel on Saga Fjordbase found a full mudskip left after . . .

Johan Kjos-Hanssen / Morten Laget



PDF


Edit


PGNiG
4921 – PGNiG

Deepsea Yantai Logistics
Own Experience
Operational 6608/1-1 S
Copernicus
Other 20/09/2022 Due to late busy vessel schedule of PSV and MI Swaco vessel MS Norbar, mud for 8-1/2″ Section was . . .

Johan Kjos-Hanssen / Morten Laget



PDF


Edit


PGNiG
4922 – PGNiG

Deepsea Yantai Logistics
Own Experience
Operational 6608/1-1 S N/A 12/09/2022 Captain of the vessel suggested to use the Brine tank for the Premix as Premix does not contain . . .

Johan Kjos-Hanssen / Morten Laget



PDF


Edit


Wellesley
2401 – Wellesley

Borgland Dolphin Drilling
Own Experience
Operational 36/1-4
Hemispheres
Production section 30/12/2021 ALL mud skips was put on the same boat, effectively removing any hope for recieving backload on said . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
2347 – Wellesley

Borgland Dolphin Logistics
Own Experience
Operational 36/1-4
Hemispheres
Top hole 28/12/2021
Saga Fjordbase took the 75ft riser joint and backloaded in addition to the 30″ conductor joints. The . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
2326 – Wellesley

Borgland Dolphin Logistics
Own Experience
Operational 36/1-4
Hemispheres
Top hole 26/12/2021 The base and boat backloaded the primary and secondary 18 3/4″ WHHs instead of two 30″ conductor . . .

Drilling Engineer / Morten Laget


PDF


Edit


INEOS
2272 – INEOS

Borgland Dolphin Logistics
Own Experience
Operational 6306/3-1 S
Fat Canyon
Production section 04/11/2021 SLB D&M sends out several 8ft containers only filled with for examples batteries. One therefore . . .

Drilling Engineer / Morten Laget


PDF


Edit


INEOS
2211 – INEOS

Borgland Dolphin Logistics
Own Experience
Operational 6306/3-1 S
Fat Canyon
Top hole 07/10/2021 The PSV boat was sent without the 9 7/8″ Pilot BHA due a mistake in WELS. The loadout day of the BHA . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
2196 – DNO

Borgland Dolphin Logistics 2/5-15
Gomez
04/10/2021 Backloaded with lack of information. Sent to wrong vendor/handled wrong. The casing was mistakenly . . .

Martin Vikse / Morten Laget


PDF


Edit


INEOS
3403 – INEOS

Borgland Dolphin Drilling
Own Experience
Operational PL937
Fat Canyon
Top hole 01/10/2021 Pilot Hole BHA was missed when boat went out from KSU. This was detected by DE offshore when he . . .


PDF


Edit


DNO
2305 – DNO

Borgland Dolphin Logistics
Own Experience
Operational 2/5-15
Gomez
P&A 15/09/2021 Missing Protectors for 13-3/8″ Casing

Johan Kjos-Hanssen / Morten Laget



PDF


Edit


DNO
2094 – DNO

Borgland Dolphin Logistics
Own Experience
Operational 2/5-15
Gomez
Reservoir section 23/08/2021 Prior to mobilization of 8-1/2″ BHA, Coring and Wireline tools we held a aligmnement meeting to . . .

Johan Kjos-Hanssen


PDF


Edit


DNO
2117 – DNO

Borgland Dolphin Logistics
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
Other 13/07/2021 Did not not get enough plates from rig and.

Johan Kjos-Hanssen / Stig Seland



PDF


Edit


DNO
1531 – DNO

Borgland Dolphin Logistics
Own Experience
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 21/05/2021 Max PAX during operations landed on 16 PAX in even good flying conditions and personnel was bumped . . .

Johan Kjos-Hanssen / Stig Seland



PDF


Edit


Wellesley
556 – Wellesley

Borgland Dolphin Logistics Operational 6204/11-3
Schweinsteiger
Rig move 21/09/2020 19 persons booked transport by bus to Fedafjorden. Positive feedback from service companies and . . .

Johan Kjos-Hanssen


PDF


Edit


Wellesley
232 – Wellesley

Transocean Arctic Logistics Operational 35/11-21 S
Grosbeak West
Top hole 16/06/2020 Crane operator was unable to lift from supply vessel as basket was too heavy at one end due to 36″ . . .


PDF


Edit


Wellesley
251 – Wellesley

Transocean Arctic Drilling Operational 35/11-21 A
Grosbeak
P&A 16/06/2020 N/A


PDF


Edit


PGNiG
343 – PGNiG

Deepsea Nordkapp Drilling Operational 6507/5-9 S, 6507/5-9 A
Shrek
Surface section 22/10/2019 Unable to locate XO sub (DC58/TT550 NOV/Intelserv) offshore for 17 ½” BHA. New crossover had to be . . .


PDF


Edit


PGNiG
360 – PGNiG

Deepsea Nordkapp Drilling
INTERNAL
Operational 6507/5-9 S, 6507/5-9 A
Shrek
Production section 22/10/2019 Casing was sent out one week before handling equipment.


PDF


Edit


PGNiG
335 – PGNiG

Deepsea Nordkapp Drilling Operational 6507/5-9 S, 6507/5-9 A
Shrek
Rig move 21/10/2019 The c-plate was onshore and put on spud boat just in time.