Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
8483 – DNO

Deepsea Yantai HSEQ Operational 35/10-13
Kjøttkake
P&A 24/03/2025 When cementer was dropping/pushing CST into DP filled with OBM “splashed” out of pipe and spilled on . . .

Sander Schaathun / Stig Seland


PDF


Edit


DNO
8484 – DNO

Deepsea Yantai Drilling Planning 35/10-13
Kjøttkake
P&A 24/03/2025 3 ½” DP was racked back in due time, but handling such small tubular takes time.

Sander Schaathun / Stig Seland


PDF


Edit


DNO
8380 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
P&A 04/03/2025 Indication of cut was not recognized. Decided to POOH and run in with B/U cutting eq. with marine . . .

Sander Schaathun / Stig Seland


PDF


Edit


DNO
8381 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
P&A 04/03/2025 When cutting the 9 5/8” casing with low flow / pressure, the parameters spiked / fluctiated. When . . .

Sander Schaathun / Stig Seland


PDF


Edit


DNO
8382 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
P&A 04/03/2025
Lost rubber drill pipe wiper downhole.
After pulled out with the cement stinger and when changing . . .

Sander Schaathun / Stig Seland


PDF


Edit


DNO
8383 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
P&A 04/03/2025 The swedge that arrived the rig had a XO. When setting a Kelly cock on the swedge the total length . . .

Sander Schaathun / Stig Seland


PDF


Edit


PGNiG
8288 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
P&A 15/02/2025 Could not find BHAs in drilling program

Drilling Engineer


PDF


Edit


PGNiG
8289 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
P&A 15/02/2025 Cutting job planned with long knives to ensure ability to cut through casing joints in case of . . .

Drilling Engineer


PDF


Edit


PGNiG
8290 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
P&A 15/02/2025 Primary cutter was tempest backup cutter was conventional with marine swivel. Lack of annular swivel . . .

Drilling Engineer


PDF


Edit


DNO
6978 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
P&A 21/11/2024 Sat the EZSV and tagged with 6t and and overpull of 27t. Performed two pressure tests, but both . . .

Drilling Engineer


PDF


Edit


DNO
6967 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
P&A 11/11/2024 For plug #1D incorrect concentration of retarder was used in the cement mix – extending the . . .

Lene Lomeland


PDF


Edit


DNO
6968 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
P&A 11/11/2024 Due to incorrect concentration of retarder in #1D it was uncertainty of the density of the cement . . .

Lene Lomeland


PDF


Edit


DNO
6969 – DNO

Nobel Invincible Drilling Planning 2/6-7 S
Falstaff
P&A 11/11/2024 Attempted to dress off cement after the sample in the UCA cell started to build compressive . . .

Lene Lomeland


PDF


Edit


Wellesley
6455 – Wellesley

COSLPromoter Drilling
Own Experience
Operational 35/10-12 S
Gnomoria
P&A 05/07/2024 Observed flowback of the mud lost while running and cementing 9 5/8″ casing. Of ±200 m3 of mud lost, . . .

Drilling Engineer / Morten Laget



PDF


Edit


Wellesley
6456 – Wellesley

COSLPromoter Drilling
Own Experience
Operational 35/10-12 S
Gnomoria
P&A 05/07/2024 Discussion about the risk of accidentally pulling the seal assembly free (no outer lock ring . . .

Drilling Engineer / Morten Laget



PDF


Edit


DNO
5909 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
P&A 05/09/2023 Due to high percentage of gas in the mud return the interface had to go over the shaker system and . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5907 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
P&A 03/09/2023 It was not clearly stated in the HLB cement program how the cement calculations should be carried . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5845 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
P&A 12/07/2023 Pulled casing hanger with upper annular closed and C&K lines closed.

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
4913 – PGNiG

Deepsea Yantai Drilling Operational 6608/1-1 S
Copernicus
P&A 23/09/2022 When pulling the conductor there was no cement stuck to it due to use of protane wrapping on the . . .

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
4910 – PGNiG

Deepsea Yantai Drilling Operational 6608/1-1 S
Copernicus
P&A 19/09/2022 After setting 8 1/2″ OH P&A Cement Plug the plan was to circulate clean at 100 m over TOC and . . .

Drilling Engineer / Morten Laget