What happened in P&A:
After setting 8 1/2″ OH P&A Cement Plug the plan was to circulate clean at 100 m over TOC and WOC at same depth

What Was Planned

After setting 8 1/2″ OH P&A Cement Plug the plan was to circulate clean at 100 m over TOC and WOC at same depth

What Was Learned

Pull above and stay stationary without circulation 100 m above circulated depth to avoid being close to potential cement and barite sagging

What Actions Are Required

Pull above and stay stationary without circulation 100 m above circulated depth to avoid being close to potential cement and barite sagging