What happened in P&A:
3 ½” DP was racked back in due time, but handling such small tubular takes time.

What Was Planned

R/B 3 1/2″ Stinger

What Was Learned

Odfjell is investigating the possibillity to change from 3 ½” DP to 4” DP as standard stinger. Should be better for handling, racking in derrick etc.

What Actions Are Required

Follow it up next time using DSY.