What happened in P&A:
Sat the EZSV and tagged with 6t and and overpull of 27t. Performed two pressure tests, but both failed leaking off at around 19 bar. Tried to tag the EZSV again with 15t. and redid the pressure test. Test was successful.

What Was Planned

Setting of 20” EZSV.
RIH with EZSV (hydraulig) and EZSV running tool. Set EZSV at 430m, tag, overpull and pressure test

What Was Learned

Tag with 15t and not 6t. It is even stated in Halliburtons procedure that the EZSV should be tagged with 15t.