What happened in P&A:
When cutting the 9 5/8” casing with low flow / pressure, the parameters spiked / fluctiated. When increased flow to 1700 lpm /110 bar the parameter stabilized.

What Was Planned

Cut 9 5/8″ casing with marine swivel / Tempest cutter.

What Was Learned

The flowrate/pressure needs to match the rig pulsation dampers in order to get stable parameters. The knives did not reflect 53 minutes of cutting time. Once we saw stable parameters the casing was cut shortly after (approx. 5 min).

What Actions Are Required

Implement in future DOP. Check rig pulsation damper settings prior to job.
WFD to follow up internally.