By: Drilling Engineer

Report No.

5845

Discipline/Origin

Drilling
Own Experience

Well

Carmen
35/10-10S

Date created

2023/07/12
878 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

BOP
Negative

Deepsea Yantai


What happened in P&A:
Pulled casing hanger with upper annular closed and C&K lines closed.

What Was Planned

Pulling 13 5/8″ casing hanger with seal assembly with BOP upper annular closed.

What Was Learned

Due to C&K and annular being closed, was not possible to pull hanger completely free due to vacuum effect. Had to open choke line and then pull free, and then close choke line again.

What Actions Are Required

For future hanger pulling with seal assembly still attached, it is crucial that choke or kill line is open when pulling free hanger, then close the line. This to not create any vacuum when pulling, which makes the pull almost impossible, or required significant overpull.

What Was Done

Written lesson learned of the incident and incorporated into the ‘As Done’ DOP.