WE Report

Lessons Learned

Lesson Learned





By: Drilling Engineer

Report No.

5910

Discipline/Origin

Drilling
No origin

Well

Norma
25/7-11 S

Date created

2023/09/05
823 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Planning
No classification

Deepsea Yantai


What happened in Reservoir section:
High gas in return and losses. Believed to be due to ballooning effect. Once the well was flow checked the lost mud came in return. The mud weight was reduced to 1.95 sg, and the losses disparaged

What Was Planned

To drill the 8 1/2″ sidetrack with 1.97 sg mud to CP.

What Was Learned

To evaluate to drill the reservoir section with lower mud weight if risk of ballooning effect and increase the mud weight prior to the reservoir.

What Actions Are Required

For future HPHT wells with increased risk of ballooning, evaluate to start the reservoir section with lower mud weight and increase prior to entering the reservoir if possible. Especially if the well is sidetracked and the formation tops and pressure is known.