WE Report

Lessons Learned

Lesson Learned





By: Lene Lomeland

Report No.

6806

Discipline/Origin

Drilling
No origin

Well

Falstaff
2/6-7 S

Date created

2024/10/07
425 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Planning
No classification

What happened in Top hole:
Used BX3 when FA-1 was observed to be incompatible with 20” casing.

What Was Planned

BX3 elevator planned as back-up solution if FA-1 failed

What Was Learned

Only means of washing down was a single 20” water bushing.

What Actions Are Required

Look for solution as back up in future using long bails and 2 x water bushings (make up one, run the other) to wash down if required.