Lesson Learned





By: Drilling Engineer

Report No.

8270

Discipline/Origin

Drilling
No origin

Well

Tomcat
6501/10-1

Date created

2025/02/14
295 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
No classification

Deepsea Yantai


What happened in Surface section:
Due to bad weather and rig movement, it was evaluated and decided to install CRTi to be able to sting in and stabilize top joint while M/U same with csg tong.

What Was Planned

Run 20″ csg

What Was Learned

The CRTi worked well after enough weight/ joints run to give a more stable stickup in rotary.

In the beginning it was beneficial to not sting in with the CRTi to let the top joint move with the box in rotary and M/U during calm periods, while tensioning up winches in moonpool to keep the movements to a minimum.

What Actions Are Required

Evaluate weather prior to running 20” csg and use CRTi/ other alternative if available.

Rig up winches in moonpool to help reduce movement.