What happened in Production section:
DONG handover documentation: Due to LWD tool failures on previous reservoir sections it was decided to run a mud cooler. The lower mud temeratures was by STP considered a major factor in not have any rig pump issues while drilling for a long period with high pressure (liner cooling water did not get hot).

External Actions

Include mud cooler in future reservoir sections with high temperature. Alternative larger coolers on mud pump liners.