Fra møte i september ber vi om en oppfølging av følgende aksjoner:

Actions
Based on feedback and comments raised by the PSA in the meeting, the following actions were noted:

Recommend checking Wellhead shut in pressure used in the design documents for bullheading with brine. DNO/Einar Framnes 05.10.2020

Answer

Siden møtet i høst har vi gjennomført en Risk Assessment og endret strategi, og planlegger nå bullheading med sjøvann. Dette er beskrevet i pluggeprogrammene.
Ref. Dong Drilling and Completion Programs:
• Maximum expected wellhead shut in pressure: 331 bar
• Well design pressure: 345 bar
• Maximum expected wellhead shut in pressure during Oselvar PP&A: 225 bar