No user selected

Report No.

160

Discipline/Origin

Drilling
No origin

Well

Brasse Appraisal
31/7-2 S

Date created

2017/09/28
2992 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Planning
Negative

Deepsea Bergen


What happened in Surface section:
During M/U 18 3/4″ WHH, threads got cross threaded from side to side when moving the 18 3/4″ WHH. Troubleshoot same. Where able to unscrew 18 3/4″ WHH by lifting with top drive and at same time use casing tong.

What Was Planned

Make up 18 3/4″ WH incl. 20″ ext. joint and 13 3/8″ XO to the 13 3/8″ csg

What Was Learned

During planning phase: Plan to use a “NO X COUPLING” as a box on last 13 3/8″ casing joint prior to P/U 18 3/4″ WHH. This will help to stabilize the long 18 3/4″ WHH assembly. This is especially a good help if the rig is heaving/moving.

What Actions Are Required

During planning phase: Plan to use a “NO X COUPLING” as a box on last 13 3/8″ casing joint prior to P/U 18 3/4″ WHH. This will help to stabilize the long 18 3/4″ WHH assembly. This is especially a good help if the rig is heaving/moving.