WE Report

Lessons Learned

Lesson Learned





No user selected

Report No.

161

Discipline/Origin

Drilling
No origin

Well

Brasse Appraisal
31/7-2 S

Date created

2017/09/28
2991 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Equipment
Negative

Deepsea Bergen


What happened in Intermediate section:
Remote on Cement head did not work. Had to operate manually by man in riding belt. The tool worked prior to sending out to the rig and also when arriving back from the rig.

What Was Planned

Perform the 9 5/8″ cement job using a Halliburton remote operated cement head.

What Was Learned

The Halliburton incident report concludes that is was likely an interference from other Wi-Fi sources at the rig floor which interfered with the cement head and caused the problems not getting communication. Casing running equipment experienced the same issue the same day on the Deepsea Bergen as the problem with the cement head.

Operations on the next well drilled with Deepsea Bergen were successful after shutting off unnecessary Wi-Fi routers in the drillers cabin.

What Actions Are Required

Ensure unnecessary Wi-Fi equipment and routers close by the drill floor are shut-off when testing and operating the Halliburton remote operated cement head.