164

Discipline/Origin

Drilling
No origin

Well

Brasse Appraisal
31/7-2 S

Date created

2017/09/28
2991 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Location specific
Negative

Deepsea Bergen


What happened in Reservoir section:
Core jammed off after cutting 57m, not long after making a connection. Coring was started in the Hardråde fm, resulting in cutting more core than planned in the Draupne shale.

What Was Planned

Cut 81m core starting in Draupne and ending in Sognefjord fm.

What Was Learned

N/A

What Actions Are Required

Ensure coring is started in the lower Draupne fm, or evaluate to use maximum a 63m barrel for optimising coring efficiency for the Brasse area.