Report No.

189

Discipline/Origin

Drilling
No origin

Well

Serin
35/12-7

Date created

2019/02/05
2497 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Planning
Negative

Transocean Arctic


What happened in P&A:
Observed 3 1/2″ cmt. Stinger partially plugged with debris and cement on POOH after having set 4 plugs.

What Was Planned

Set multiple P&A plug with 3 1/2″ cmt. stinger

What Was Learned

Setting multiple plugs before pulling singer to surface requires a longer slotted stinger portion.

What Actions Are Required

Extend length of slotted stinger portion for future similar jobs.