What happened in Surface section:
The stop ring for balloon centralizer on the inner string cmt stinger was installed on top of centralizer. This was wrong, and we were not able to get centralizer through the 18 ¾” WH. POOH and installed stop ring inside centralizer. This allow centralizer to “stretch out” and enter WH.

What Was Planned

Run balloon centralizer on innerstring cement stinger

What Was Learned

Centralizers on casing have stop ring above and below centralizers, but these are more rigid and of different type. For DP type “balloon centralizer”, stop ring should always be installed in middle.

What Actions Are Required

Always install stop ring in middle for “balloon centralizer”.