WE Report

Lessons Learned

Lesson Learned





By: Drilling Engineer

Report No.

5857

Discipline/Origin

Drilling
Own Experience

Well

Norma
25/7-11 S

Date created

2023/07/30
861 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Equipment
Negative

Deepsea Yantai


What happened in Top hole:
Due to problems with cement around the conductor and movement in conductor a clamp-on inclinometer from Oceaneering was sent out. It was difficult to install around the conductor and does not allow for cuttings laying around the conductor when installing. Not suitable for installation subsea, should be installed on surface. It was also difficult to read numbers when movement.

What Was Planned

No inclinometer was planned. Only planned for measuring the inclination of the WH with the bullseye on the WHRT.

What Was Learned

Difficult to install the clamp-on inclinometer subsea. Easier to install three-leg WH inclinometer from Oceaneering subsea. Difficult to read off values of the inclinometer when movement in conductor.

What Actions Are Required

If WH already installed without an installed tool for measuring inclination, evaluate to use a three-leg WH inclinometer from Oceaneering that can be installed subsea.