WE Report

Lessons Learned

Lesson Learned





By: Lars Solvang

Report No.

2174

Discipline/Origin

Subsea
Own Experience

Well

Oselvar
A-1 H, A-2 H, A-3 HT2

Date created

2021/10/01
1527 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
Negative

Borgland Dolphin


What happened in P&A:
Extraction stopped as the hub was secured with wire bracing. These had to be cut before operation could commence.

What Was Planned

Extract the high pressure hub with a ROV linear tool to engage the hub with the black eagle hose.

What Was Learned

Wire bracing camouflaged by marine growth. Need to be removed before extraction of the hub can be done.

What Actions Are Required

Remove wire bracing.