Lesson Learned





By: Drilling Engineer

Report No.

2212

Discipline/Origin

Logistics
Own Experience

Well

Fat Canyon
6306/3-1 S

Date created

2021/10/07
1521 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Equipment
Negative

Borgland Dolphin


What happened in Top hole:
The container that contained swivels and HP Filterunit on the manifest was opened on the rig, but inside it was only swivels found. The HP Filterunit was express shipped from Stavanger to Kristiansund and taken out to the rig on first boat.

What Was Planned

To ship both swivels and HP Filterunit from HLB in one single container.

What Was Learned

Important to stay on-guard with the service companies to assure they deliver equipment according to the plan.

What Actions Are Required

Talk with the service companies and ask them if they have delivered what is required and planned for.

What Was Done

The HP Filterunit was express shipped to Kristiansund on a trailer and a go-ahead from Dolphin that we can start drilling 9 7/8″ pilot hole without that onboard, no NPT was experienced.