Negative

Transocean Arctic


What happened in Surface section:
Several joints had to be broken out and made up again due to difficulties with centralizing joints with elevator. No good make-up graph. Long bails were used due to installation of CRT.

What Was Planned

M/U 13 3/8″ Casing

What Was Learned

Use fill up tool which can be used with drilling bails.