WE Report

Lessons Learned

Lesson Learned





By: Drilling Supervisor

Report No.

1993

Discipline/Origin

Drilling
Own Experience

Well

Oselvar
A-1 H

Date created

2021/07/19
1601 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
Positive

Borgland Dolphin


What happened in P&A:
Jacked 9 5/8″ free using Baker Mastodon jacking tool. Used 49 pressure cycles to jack casing 17 m, before it was pulled with Ram rig. Used up to 571 t pull force on 9 5/8″ casing.

What Was Planned

Unable to pull 9 5/8″ casing free after cutting at 1857 m. Pulled up to 310 MT hookload. No go. Planned to jack casing free using Baker jacking tool (Mastodon) for 9 5/8″ x 13 3/8″.

What Was Learned

Easy and efficient tool with high power output.

What Actions Are Required

None. Recommended for similar operation in the future.