What happened in Production section:
Drilled section with planned mud and mud weight without problems with cavings. Cavaings identified at TD and MW increased to 1.52 sg in two stages.

What Was Planned

Drill long 12 1/4″ section through Hordaland, Rogaland, Shetlandusing 1.48 sg OBM.

What Was Learned

Hole stabilized, trip out from TD ok.

What Actions Are Required

Review K&M drilling practices related to minimizing risk of “mini shocks” on hole casing breakout.