WE Report

Lessons Learned

Lesson Learned





No user selected

Report No.

321

Discipline/Origin

Drilling
No origin

Well

Canela
6507/7-16 S

Date created

2019/01/07
2526 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
Positive

Island Innovator


What happened in Production section:
High values of LOT/FIT expected; 1.95 sg EMW. Value of ESD measured by LWD tool ahead of FIT was 1.367 sg. Used LWD value for calculating max surface pressure for FIT. Good result, 1.95 sg achieved, way in excess of that required to drill reservoir.

What Was Planned

9 5/8″ casing FIT

What Was Learned

Measured mud weight in/out after conditioning mud before FIT was 1.33 sg.

What Actions Are Required

Refer to ESD from LWD as well as calculated value, discuss with onshore suport before test if big differences, consider using measured value from LWD tool especially if greater than calculated. Could mean difference between successful LOT and fracking formation.