Equipment
Negative

Deepsea Nordkapp


What happened in Surface section:
IKM MRR 300 system (modified in lack of 500 system), failed to deliver adequate flow (3500lpm), resulting in NPT as well as going back to seawater and sweeps and returns to seabed.

What Was Planned

Open pilot hole to 17 1/2″ and drill to 1100 m using MRR and 1.40 WBM and returns to surface, as contingency against SHWF.

What Was Learned

Modified MRR 300 systems should not be considered equal to that of the intended MRR 500 systems.

What Actions Are Required

If faced with a modified version of the MRR system again, it is better to change supplier.