WE Report

Lessons Learned

Lesson Learned





No user selected

Report No.

350

Discipline/Origin

Drilling
No origin

Well

Shrek
6507/5-9 S, 6507/5-9 A

Date created

2019/10/22
2238 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Equipment
Negative

Deepsea Nordkapp


What happened in Surface section:
Unable to make up Dril-Quip 13 3/8” no cross coupling (VAM 21) to WH assembly (VAM 21).
Had to break off 1 m saver sub joint on WH assembly and replaced no-cross coupling joint with a regular joint. Had to change out box on connection jt below no cross jt as well.

What Was Planned

M/U Dril-Quip 13 3/8″ no cross coupling to 18 3/4″ WH assy (both VAM 21).

What Was Learned

After an investigation by independent parties it was clear that the driller had been overly eager when running and installing the wellhead, as too much weight was put down, effectively ruining the threads on the connection.

What Actions Are Required

Driller to take it slow and steady and stay within recommended paramters at all times. It should be clearly written in RAP/DOP to be mindful of this.