What happened in Surface section:
Silo #4 achieved desired pump rate (800 lpm) by opening the valves 7 %.
Silo #2 achieved same only after opening valves 60%, using the same mix.

What Was Planned

Mix and pump cement from silos #2 and #4.

What Was Learned

Odfjell need to gather the learnings and use the learnings to build bulk transfer experience.

What Actions Are Required

Odfjell need to gather the learnings and use the learnings to build bulk transfer experience.