No user selected

Report No.

361

Discipline/Origin

Drilling
No origin

Well

Shrek
6507/5-9 S, 6507/5-9 A

Date created

2019/10/22
2238 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
Negative

Deepsea Nordkapp


What happened in Production section:
Cement stand is big and difficult to handle. Time consuming to rack back and lay out. Cement stand was not racked back with hose and lo-torq but this had to be made up in a basket when RIH.

What Was Planned

M/U cement stand.

What Was Learned

Rack cement stand back with lo-torq and hose, secured with with double sling is time efficient.

What Actions Are Required

Evaluate to use CLA (casing landing assembly) on future operations. No need make up and rack back cement stand as the CLA eliminates issues with spaceout.